MG TOP B P User Manual Download Page 8

 
 

 

 

 

 

 

 

 

 

 

 

 

USER GUIDE

 

Pneumatic Blind Stapler

 

TOP SP P, TOP B P

 

 

Page:  

Version:

  

0711 

ET 572

 

 

Page 8 of 10     18.10.11       P:\Technik\TOP\Bedienungsanleitung\Englisch\Operation Instructions TOP P 0711.DOC 

 

 

 
Before the start of all major maintenance and cleaning, all safety precautions must be taken and the 
pressurized air supply must be switched off and disconnected.  

 

The  following  work  processes/inspections  should  be  performed  by  knowledgeable  personnel  on  a 
regular basis: 

  Regular cleaning of the stapling machine 

  Regular oiling of the movable parts (no graphite oil!) - on a weekly basis 

  Check the maintenance unit for condensation. If necessary remove the condensation. 

  The maintenance unit should be set to 1 drop of oil per 30 stapling cycles. (1/8 turn) 

  In case of sluggishness or blockage of the driver, loosen the screws (57 and 58) on the head piece 

(51) thus releasing any possibly present stress in head-piece and then tighten these screws firmly 
again.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

  Cleaning of cardboard dust  

 

Only ORIGINAL spare parts may be used. (see “spare parts list”)

 

Failure to comply will void any guarantee claim and exclude any liability!

 

 

Only original spare parts are subjected to our quality control. To ensure a safe and reliable operation, 
only spare parts from the manufacturer may be used. 

               

 

All technical equipment, especially the safety equipment, must be inspected by professional staff after 
a modification or repair. 

8.1 

Reloading of TOP staples

 

Pull  the  transport  puck  (9)  back  and  upwards  until  it  snaps  in.  After 
inserting  the  3  staple  strips  (120  staples)  gently  press  down  the 
transport  puck  (excessive  force  will  cause  a  rupture  of  the  transport 
bands and a breaking of the staple strips) and bring it into a tensioned 
position. 
 

 

09

 

       57               

  51 

 

 
 
 
 
58 

Summary of Contents for TOP B P

Page 1: ...or the fast and stable blind stapling of filled folding boxes made of corrugated cardboard Loading capacity 120 TOP staples IMPORTANT Before the first commissioning read this manual thoroughly and com...

Page 2: ...in brief and clear form The chapters are sorted by numbers Copyright The copyright of this operation manual remains with MEZGER Heftsysteme GmbH Contents overview Contents overview 2 1 Conformity 2 2...

Page 3: ...ed Prohibition Protect from moisture Read all these instructions before using the stapler and keep the safety instructions in a safe place Safety on the well The operating personnel must be trained in...

Page 4: ...an the specified usage scenarios this can lead to accidents 3 1 Application area designated use Pneumatic blind stapler TOP SP P and TOP B P are used for stapling filled folding boxes made of single a...

Page 5: ...the field of stapling machines and is familiar with the relevant government industrial safety regulations accident prevention regulations and the generally accepted rules of technology e g DIN standar...

Page 6: ...machine since this could otherwise lead to malfunctions The stapling will be more rigid if the machine is pressed onto the cardboard box harder The nose and the two markings on the head piece to serv...

Page 7: ...EINH maintenance unit consisting of a pressure regulator water separator and an oil vaporizer Periodically clean the cardboard dust from the TOP blind stapler preferably with a blowgun 7 Decommissioni...

Page 8: ...hness or blockage of the driver loosen the screws 57 and 58 on the head piece 51 thus releasing any possibly present stress in head piece and then tighten these screws firmly again Cleaning of cardboa...

Page 9: ...ined by our specialists and the malfunction will be remedied Interrupt the air supply Remove any staples still present in the staple repository Remove the two screws 12 and extract the staple reposito...

Page 10: ...r staples TOP B 10 12 and 15 11 Service Repairs performed by MEZGER Heftsysteme GmbH Saganer Stra e 24 90475 N rnberg Germany or authorized professional companies Damages which are caused in particula...

Reviews: