
6.
Initial
Operation
6.4
Manual
settings
for
model
MDF
05
The
locking
screw
(H)
is
used
to
lock
the
corresponding
control
cam
in
the
desired
position.
Finer
adjustment
can
be
A
BC
D
E
F
made
with
the
fine
adjustment
screw
(G).
Set
the
CLOSED
end
position
A
Control
cam
for
additional
limit
switch,
OPEN
(green)
B
Control
cam
for
limit
switch,
OPEN
(green)
C
Control
cam
for
safety
limit
switch,
OPEN
(red)
D
Control
cam
for
safety
limit
switch,
CLOSED
(red)
E
Control
cam
for
limit
switch,
CLOSED
(white)
F
Control
cam
for
additional
limit
switch,
CLOSED
(white)
☞
Drive
the
door
to
the
CLOSED
end
position.
☞
Set
the
control
cam
so
that
the
CLOSED
limit
switch
(E)
is
actuated.
☞
Tighten
the
locking
screw
(H).
The
CLOSED
safety
limit
switch
(D)
must
be
set
in
such
a
way
that
it
switches
immediately
when
the
CLOSED
limit
switch
(E)
is
passed
over.
☞
Adjust
the
CLOSED
safety
limit
switch
(D).
Set
the
OPEN
end
position
☞
Drive
the
door
to
the
OPEN
end
position.
☞
Set
the
control
cam
so
that
the
OPEN
limit
switch
(B)
is
actuated.
☞
Tighten
the
locking
screw
(H).
The
OPE N
safety
limit
switch
(C)
must
be
set
in
such
a
way
that
it
switches
immediately
when
the
OPEN
limit
switch
(B)
is
passed
over.
☞
Adjust
the
OPEN
safety
limit
switch
(C).
H
G
G
Fine
adjustment
screw
H
Locking
screw
Each
control
cam
has
a
locking
screw
(H)
and
a
fine
adjust-
ment
screw
(G).
10
–
Roll-Up
Door
Operator
/
MDF
/
Rev.
0.0
Summary of Contents for MDF 05-10-15
Page 1: ...Operating Instructions for Roll Up Door Operators MDF GB Roll Up Door Operator MDF Rev 0 0 1...
Page 21: ...GB MDF 20 22 12 KE Chain MDF 20 15 17 KE Chain Roll Up Door Operator MDF Rev 0 0 21...
Page 23: ...GB MDF 30 42 12 KU Crank MDF 30 42 12 KE Chain Roll Up Door Operator MDF Rev 0 0 23...
Page 25: ...GB MDF 30 27 12 KU 100 Crank MDF 30 30 12 KU Crank Roll Up Door Operator MDF Rev 0 0 25...
Page 27: ...GB MDF 30 50 12 KE Chain MDF 50 65 10 KU Crank Roll Up Door Operator MDF Rev 0 0 27...
Page 29: ...GB MDF 50 75 10 KE Chain MDF 6 100 9 KU Crank Roll Up Door Operator MDF Rev 0 0 29...
Page 32: ......