SYSTEM CHECKOUT PROCEDURES
The ini
�
al installa
�
on por
�
on is now completed. The checkout procedures listed below must be followed. While there are
redundant safety features built into the system, it is impera
�
ve that you follow the steps outlined below to ensure proper
and safe opera
�
on. If you encounter any irregulari
�
es, refer to the TROUBLESHOOTING GUIDE.
1.
Check all wiring connec
�
ons.
2.
Turn on main gas supply and put the manual valve or selector arm on the gas valve into the "ON" posi
�
on.
3.
Use a leak test solu
�
on to check piping for gas leaks. Repair if needed.
4.
Turn on electrical power.