![MFC SPEED CREED Operations & Parts Manual Download Page 9](http://html1.mh-extra.com/html/mfc/speed-creed/speed-creed_operations-and-parts-manual_1782236009.webp)
REV.03_9/2021
7
Machine Specifications
MACHINE
Machine weight (15’):
3,537 lbs. [1604kg]
Approximate weight per foot for additions:
119 lbs. [54kg]
Hydraulic Oil Reservoir (ISO 46):
10 gallons [37.85L]
Available machine lengths (in 1’ increments):
10’-30’ [3m-9.1m]
Fuel Reservoir:
12 gal. [45.42L]
HYDRAULIC SYSTEM
Hydraulic motor attachment to each tube:
Direct drive via keyed bushing & bolt flange
Roller tube controls:
Independent electronic variable speed
control to drive rollers & slinger roller
Drive roller speed:
0’-125’ Per minute [0-.64mps]
Slinger roller speed:
150 rpm
Kickstand travel:
16” [406mm]
Kickstand extend speed:
1.2” per second [30.5 mm/s]
Kickstand retract speed:
1.8” per second [45.7 mm/s]
An electronically controlled tandem pump systemdrives the drive and slinger rollers
independently. The kickstand is standard on all machines and is controlled via two buttons at
the top of the drive roller joystick. It includes a monitoring light to indicate when the kickstand is
fully extended / retracted.
ROLLER/SLINGER TUBES
Diameter:
8” SCH.40 Pipe (Ø8.625”) [Ø219.1mm]
Wall thickness:
0.322” [8.18mm]
Weight per foot:
28.55 lbs. [12.95kg]
SUPPORT FRAMES
Frame Extension Size
Qty. Horizontal Support Tubes
Weight
5’ frame extension:
2
155 lbs. [70.3kg]
6’ frame extension:
3
198 lbs. [89.8kg]
7’ frame extension:
4
240 lbs. [108.8kg]
8’ frame extension:
4
260 lbs. [117.9kg]
9’ frame extension:
5
302 lbs. [137.0kg]
10’ frame extension:
5
321 lbs. [145.6kg]
All frame sections are made from 2”x6”x1/8” and 2”x2”x1/8” steel tubes with 3/8” bolt plates.
Operator work platform comes standard, and an Idler end platform and/or counterweight is
available as an optional accessory.
SPRAY SYSTEM
Tank capacity:
50 gal. [189.27L]
Nozzles per feet:
Approx. 0.5 (depending on machine length)
Hose attachment:
Included w/ hand spray nozzle & hose reel
Summary of Contents for SPEED CREED
Page 2: ......
Page 11: ...REV 03_9 2021 9 Engine Wiring Diagram 26A CHARGING SYSTEM...
Page 12: ...10 REV 03_9 2021 Machine Dimensions...
Page 13: ...SAFETY REV 03_9 2021 11 Safety Section State Federal Regulations...
Page 27: ...REV 03_9 2021 25 PARTS Parts Full Assembly Full Assembly BOM...
Page 28: ...26 REV 03_9 2021 PARTS End Frame Power Assembly...
Page 29: ...REV 03_9 2021 27 PARTS End Frame Power Assembly Continued...
Page 31: ...REV 03_9 2021 29 PARTS Engine Assembly...
Page 33: ...REV 03_9 2021 31 PARTS Hydraulics Assembly...
Page 46: ...44 REV 03_9 2021 PARTS Fuel System Assembly...
Page 49: ...REV 03_9 2021 47 PARTS End Frame Control Panel Assembly...
Page 53: ...REV 03_9 2021 51 PARTS End Frame Lite Idler Assembly...
Page 58: ...56 REV 03_9 2021 PARTS Spray System Tank Pump Components Assembly Option...