Version: 21/03/2017
Filename: NA-MHF-19-20-COD-E_version2.doc
© Meyrat SA 2017
23 / 26
Connections for air-oil lubrication
Definition
Value
U
Power supply
230 VAC
P0
Main pressure
5 to 6 bar
P1
Pressure at the entrance of spindle
0.6 to 0.7 bar
Q1
Air flow at the entrance of spindle
approx. 35 l/min
!
ATTENTION !
It is advisable to install a coil just before the spindle so as to achieve an oil
stock in the tube. This arrangement allows to start the spindle without having to make a
lubrication cycle. Otherwise, at the start of machine, it is necessary to wait during 10
minutes after the enable of pressure before you can use the spindle.
P1
Q1
U
P0