MEWOI MEWOI68C User Manual Download Page 5

 

                                                                                                                                                                                                                                   

another part of measuring object. 

d. Then the digital display voltage is the AC voltage of the metrical object in fact. 

(3) Insulation resistance testing 

a. Connection of measuring lead 
I

nsert the big plug of lead with probe to measuring terminal “

L

”, the plug of lead with clip to 

measuring  terminal  “

E

”,  and  the  black  plug  of  AC  measuring  lead  with  a  small  clip  to 

measuring terminal 

COM

”, respectively. 

b. Testing lead connected 
The lead with the big measuring clip is the leads connected with the earth. The lead with the 
high voltage’s probe is the highest-voltage leads. The lead with connecting in “

COM

” socket 

is the shield leads meeting on the surface of the testing resource to preventing the surface 
leak affecting testing resistance. Using the rotary switch select the “

OFF

” position, connect 

the clip of lead to the other side of measuring object, and the AC measuring lead’s small clip 
to the surface of measuring object. 
c. Rating Voltage select 
Select the Rating Voltage adapt to the insulation resistance you want to test . 
Turn the rotating switch to the voltage segment 

needed. 

d. Testing 
Connect  the  probe  to  object,  press  the  button  “

TEST/STOP

”,  “

HV

”  indicator  light,  which 

indicates measuring voltage happen. 
After testing begins, the number displayed on LCD is the insulation value of object tested. 
e. End 
After  the  measurement  completed,  push  down  the  switch  of  the  “

TEST/STOP

”  once 

more .When the red LED off, means the output testing high voltage has been cut. Turn the 
rotary  switch  to  “

OFF

”  position.  If  measure  the  contain  nature  load,  please  short  the 

residually electric of the testing resource first before move the testing leads. 

(4) Data hold 

On  any  range,  press  the 

HOLD

”  key  to  lock  display  value,  and  the  “

HOLD

”  sign  will 

appear on the display, press it again to exit. 

(5) Back light 

On  any  range,  press  the 

LIGHT

”  key  to  light  the  back  light.  The  light  can  wink 

automatically after approx. 10 seconds. 

8. Battery replacement 

1) When the battery voltage drop below proper operation range, 

  the 

” symbol    will    appear on    the LCD display and the 

  battery need to changed (or charge the battery by the charger). 

2) Before changing the battery, set the selector switch 

to “

OFF

” position. 

3) Open the cover of the battery cabinet by a screwdriver. 
4) Replace the old battery with the same type battery. 
5) Close the battery cabinet cover and fasten the screw.

 

Caution: 

Dispose  the  used  batteries  according  to  the  rules,  which  are  defined  by  each 

community. 

9. Maintenance 

This is a precise instrument and needs careful maintenance. 

a. Don’t open the back lid at will. Don’t use it if the back lib not fixed. 
b. Put it in the place dry and airiness if the meter will be leave unused for long term. 
c

. Don’t change the inner circuit at will or the meter maybe out of use. 

If there is any problem, contact with us please. 

10. Accessories 

Reviews: