MEWOI MEWOI68C User Manual Download Page 4

 

                                                                                                                                                                                                                                   

 

 

 

 

 

 

(1) Mounting hole 
(2) High voltage startup switch: TEST/STOP 
(3) Data holding key: HOLD 
(4) Rating voltage rotating switch 
(5) Crust of meter 
(6) Protective casing 
(7) LCD 
(8) Back light switch: LIGHT 
(9) High voltage indicator light 
(10) ACV measurement terminal COM 

  / Shield input terminal for insulation 

/ Battery charge negative pole

 

(11) EARTH input terminal (Insulation) 
(12) ACV Input terminal 

/ Battery charge positive pole 

(13) LINE input terminal (Insulation) 

7. Operating specification 
(1) Safety notices 

a. There is a possibility of causing an accident of electric shock. After the measurement of 

insulation  resistance  is  completed,  be  sure  to  discharge  the  high  voltage  charged  in  the 
measuring object. 

b. There is a risk of electric shock during the measurement. Be careful not to touch the 

measuring terminal and measuring object during the measurement. 

c.  When  the  circuit  is  activated,  make  measurement  after  disconnecting  the  power 

source. 

d.  Make  measurement  within  the  insulation  resistance  measuring  range,  and  never 

impress voltage from outside, or the tester will be destroyed. 

e. Be sure to confirm the position of rotary switch and the connection of measuring lead 

with the tester before starting the measurement. 

f. When start the high voltage startup switch, there is a high voltage about 100V

5000V 

between 

L

 and 

E

, must not touch the bare part of meet and object be tested cause of the 

danger of been shocked.

 

(2) AC voltage test 

a. 

 

Don’t test up AC 750V voltage. It is Dangerous! 

b. Connect the measuring Leads 
Insert the red plug of lead with 

probe to measuring terminal “

V

”, and the black plug of 

AC measuring lead to measuring terminal 

COM

”, respectively. 

c. Connect to the measuring object 
Using the rotary switch select the “

750V

” position. Connect the test pin of lead with 

probe  to  the  other  side  of  measuring  object,  and  the  test  pin  of  AC  measuring  lead  to 

Reviews: