MEWOI MEWOI2600 User Manual Download Page 12

-9- 

 

turning  upwards  or  downwards  in  cycle.  When  reaching 

EXIT

” ,Press 

MEM

 to exit from data reference mode, returning 

to normal testing mode.   

6.    Data Deletion 

Under  data  reference  mode,  press 

Right  Left  Arrow

 

button  to 

Delete

”  position,

 

press 

MEM

  button  to  enter  data 

deletion mode, press 

Right or Left Arrow

 to move to 

“YES” or 

“NO” position, press 

MEM

 button to conduct the deletion and 

return to normal test mode. 

7.    Backlight brightness 

In any mode, press the up and down arrow keys to change the 

brightness of the LCD backlight. The brightness value of the 

LCD backlight is automatically stored, and the stored 

brightness value is automatically restored when the instrument 

is turned on 

8.Data Upload 

      Connect the computer and the host USB communication line, 

boot, run the software, that is, you can read the historical data 

stored by the meter, upload to the computer and manage the 

data. 

The software needs to be installed by Windows XP/2000 

system. It has the functions of on-line real time data, historical 

inquiry, data storage, vector diagram instruction and phase 

indicating function. It has the functions of reading, searching, 

saving and printing historical data. 

9. 

Self-Checking

 

     

Please  perform  self-calibration  before  on-site  phase  detection 

to make sure the instrument is working properly. The upcoming 

Summary of Contents for MEWOI2600

Page 1: ...Wireless High Voltage Phase Detector MEWOI2600 User Manual www mewoi com...

Page 2: ......

Page 3: ...cture 6 V Operation 7 1 Host Power On Off 7 2 Detector Power On off 7 3 Data Maintenance 8 4 Data Memory 8 5 Data Reference 8 6 Data Deletion 9 7 LCD Screen 9 8 Data Transmission 9 9 Self checking 9 1...

Page 4: ...oltage of tested circuitry has exceeded 400V it must be used by connecting with an insulation rod As it is very dangerous of high voltage transmission line the operator must get strict training and th...

Page 5: ...y danger may occur if continue to use it stop using it immediately and seal it up for keeping at once which shall be dealt with by qualified authorization agency The danger symbol on the meter and the...

Page 6: ...he electricity and judging transformer groups MEWOI2600 wireless high voltage phase detector is composed of a host machine detector telescopic rod insulation monitoring software USB communication line...

Page 7: ...ector Zinc manganese dry batteries 6F22 9V Phase Detect Modes 1 Contact Phase Detect can contact wire which is below 35KV bare wire or 220KV With insulation Cover 2 Non Contact Phase Detect conduct no...

Page 8: ...c shut down Turn on the instrument for about 5 minutes Battery Voltage When the battery voltage dropped to 7 2V 0 1V the battery voltage is low symbol display to remind the replacement of the battery...

Page 9: ...ral technical requirements for portable nuclear power apparatus for use in 1kV 35kV portable power plants DL T971 2005 IEC61481 A2 2004 IEC 61243 1 ed 2 2003 Accessories Host 1set Detector 2 pieces Pr...

Page 10: ...cording to manual instructions to install the battery 1 Host Power On Off Press POWER button to power on the instrument will displays the LCD screen Press POWER button to power off If LCD display is r...

Page 11: ...on again to release data lock returning to normal testing mode and HOLD symbol disappears Data Storage Data Reference 4 Data Memory Under normal testing mode press Left Arrow to hold and store the dat...

Page 12: ...LCD backlight is automatically stored and the stored brightness value is automatically restored when the instrument is turned on 8 Data Upload Connect the computer and the host USB communication line...

Page 13: ...onal injury or damage to equipment Cannot be used to test more than 220kV voltage line otherwise there is an electric shock causing personal injury or equipment damage The high voltage test must be co...

Page 14: ...etal hook detector into metal probe Non contact phase detection If the lines are relatively close to each other should test the position of the wire where is far away from the other wires Phase detect...

Page 15: ...ough Please replace the battery in time 1 When the battery voltage is below 7 2V 0 1V the meter will display symbol the power indicator flashing Indicates that the battery is low Please replace batter...

Page 16: ...If not please repeat the operation according the step 2 IX Accessories Host 1pcs Detector 2pcs Detector Probe Hook Probe 2pcs each Calibration line 1pc USB Cable 1pc Monitoring software CD 1pc Bag 1se...

Page 17: ...Your Testing Specialist...

Reviews: