Starting the DPU
Metso Automation MAX Controls
••••
277573
••••
6-7
20.
Place the keyswitch of the new DPU in the Run or Locked mode.
21.
If the new DPU is the primary of the pair, wait at least 10 seconds to
allow its database to be updated, then press its Takeover button to give
it control.
22.
Acknowledge all DPU alarms and make sure they all clear.
23.
If the DPU is to be shipped or put in storage, unplug the NiCd battery
pack from the P10 connector.