![metso automation DPU Bus Troubleshooting Manual Download Page 26](http://html.mh-extra.com/html/metso-automation/dpu-bus/dpu-bus_troubleshooting-manual_1780219026.webp)
DPU Bus Troubleshooting
Metso Automation MAX Controls
••••
277581
••••
3-4
EC
Electrical clockwise cable is broken.
BC
Both clockwise cables are broken.
OCC
Optical counter-clockwise cable is broken.
ECC
Electrical counter-clockwise cable is
broken.
BCC
Both counter-clockwise cables are broken.
Note
: If the station is no longer passing the token, the status field will be
striped out representing no response from the station.
Figure 3-2. DPU Bus Map Display
Using IGAP, UGAP Buttons, etc.
The display includes buttons labeled
IGAP
,
UGAP
,
RZAP
, and
Statistics
.
Refer to the following for a description of their respective functions:
IGAP
The IGAP (Initialize Go Ahead Pointers) function is used to
increase system efficiency by skipping nonexistent station
numbers on a DPU Bus. Accordingly, each time new
stations are added in an IGAPed system, the DPU Bus must
be un-IGAPed (UGAP) to allow the new stations to be
recognized. If you are adding new stations, you should
UGAP the DPU Bus, verify that the new stations are
performing correctly, and then IGAP the DPU Bus again.