
CS 2099 Eurocheck
Table of contents
3
1
Introduction to CS 2099 – Eurocheck ........................................................ 4
2
Safety and operational considerations...................................................... 5
2.1
Warnings ....................................................................................................... 5
2.2
Standards applied.......................................................................................... 5
3
Eurocheck description and maintenance.................................................. 6
3.1
Front panel .................................................................................................... 6
3.2
Side panel...................................................................................................... 7
3.3
Replacing fuse ............................................................................................... 8
3.4
Cleaning ........................................................................................................ 8
3.5
Periodic calibration ........................................................................................ 8
3.6
Service........................................................................................................... 8
4
Eurocheck operation ................................................................................... 9
4.1
Recommended calibration sequence and practice ........................................ 9
4.2
Sample test report form ............................................................................... 10
4.3
Selecting calibration function/sub-function................................................... 11
4.4
Selecting appropriate test cable for calibration ............................................ 11
4.5
Fault loop impedance calibration ................................................................. 12
4.6
Trip-lock impedance calibration ................................................................... 14
4.7
Line impedance calibration .......................................................................... 15
4.8
RCD trip-out time calibration........................................................................ 16
4.9
RCD measuring current I
Δ
n=30 mA verification .......................................... 17
4.10
Insulation resistance calibration................................................................... 17
4.11
Low
Ω
and continuity resistance calibration.................................................. 18
4.12
Voltage and frequency calibration................................................................ 20
4.13
Continuity and insulation of measurement leads verification ....................... 21
4.14
PE test terminal operation verification ......................................................... 22
5
Technical specifications ........................................................................... 23
5.1
General........................................................................................................ 23
5.2
Calibration references.................................................................................. 23