![Metreel ALULIFT Operation & Maintenance Instructions Manual Download Page 5](http://html1.mh-extra.com/html/metreel/alulift/alulift_operation-and-maintenance-instructions-manual_1778910005.webp)
Portable Aluminum Gantry Crane
Operation & Maintenance Instructions
Document No. TD005-0618
Last Updated: 21 June 2018
Page 5 of 12
INITIAL SET UP
(Should only have to be done once)
Building The A-Frame’s
Step 01
Place the Upright Assembly on the floor as shown in Fig 01
Align the angled length to the bottom pre-drilled hole of the top plate as shown in Fig 02
Bolt together using the supplied fixings as shown in Fig 03
Fig 01
Fig 02
Fig 03
Step 02
Using the supplied fixing, attach
the Castors to the bottom of each
leg ensuring that the brakes are
facing outside as shown in Fig 04
Fig 04
Step 03
Turn the Leg Assembly onto it’s side to allow easy insertion of the Upright Assembly and pin together through the
top pre-drilled hole using the supplied Loop Pins as shown in Fig 05
Ensure the Pin is kept in place by using the supplied clip as shown in Fig 06
Fig 05
Fig 06