3-30 | Model 920 Multi-Gas Analyzer
Purged Analyzers
The Electronics Enclosure and its Optical Bench and Measuring Cell
Extension are continuously purged with Instrument Air to adequately
dilute any flammable gases that may have been released into these areas.
This function effectively prevents an internal explosion when the ana-
lyzer is powered up and operating under normal sampling conditions.
AMETEK analyzers that require purged enclosures in hazardous locations
use an Expo Technologies MiniPurge
®
System With eTimer to perform
this function.
The purge air supply is normally obtained from the Instrument Air supply
connected directly to the Expo MiniPurge
®
System. The required purge
air supply pressure for your analyzer is indicated on Final “As-Built”
drawings in the analyzer Documentation Package.
After the Instrument Air supply has been connected to the MiniPurge
®
system, the
ALARM/PRESSURIZED
indicator on the MiniPurge
®
system
(Figure 3-9) turns from RED (Alarm condition) to GREEN (Pressurized).
Next, the system’s eTimer begins its purge timing cycle, and the four
PURGE TIMING
indicator LEDs will flash (YELLOW) sequentially, each
for 25 % of the total purge time (minimum 15 minutes). During this stage,
the MiniPurge
®
system will purge any flammable gases that may have
entered the Electronics Enclosure while its door was open, and then pres-
surize the enclosure. After the timing sequence is completed (LEDs off),
the pneumatic switch will send a signal to the analyzer and the analyzer
will power up (if the Purge Bypass Switch is in the “
ACTIVE
” position, if
all fuses have been engaged, and if the external explosion-proof power-
disconnect switch has been closed).
A minimum of 15 minutes is required to properly purge and pressur-
ize the analyzer Electronics Enclosure.
The Expo Technologies MiniPurge
®
System uses a Battery Pack to
power its purge timer. AMETEK recommends replacing the Battery
Pack every three years to ensure proper and safe operation of the
purging system. See “Analyzer Preventive Maintenance Schedule” in
Chapter 6 for more information.
Working with the purged enclosure open is typically limited to installa-
tion, start-up, and certain troubleshooting and maintenance procedures.
In these cases, the Purge Bypass Switch (Figure 3-10) must be in the
“
BYPASS
” position (and appropriate safety conditions must have been
met, as per company policy).
For normal analyzer operation, the Purge Bypass Switch must be in the
“
ACTIVE
” position and the key must be removed (follow company policy).
!
WARNING
Summary of Contents for 920
Page 39: ...Specifications 2 11 ...
Page 40: ...2 12 Model 920 Multi Gas Analyzer ...
Page 41: ...Specifications 2 13 2019 02 05 ...
Page 42: ...2 14 Model 920 Multi Gas Analyzer ...
Page 43: ...Specifications 2 15 ...
Page 44: ...2 16 Model 920 Multi Gas Analyzer ...
Page 45: ...Specifications 2 17 ...
Page 47: ...Specifications 2 19 Heater Plate ATEX and IECEx Certificates and Marking ...
Page 48: ...2 20 Model 920 Multi Gas Analyzer ...
Page 49: ...Specifications 2 21 ...
Page 50: ...2 22 Model 920 Multi Gas Analyzer ...
Page 51: ...Specifications 2 23 ...
Page 52: ...2 24 Model 920 Multi Gas Analyzer ...
Page 53: ...Specifications 2 25 ATEX and IECEx certified Model 920 Analyzers are marked with this label ...
Page 55: ...Specifications 2 27 ...
Page 56: ...2 28 Model 920 Multi Gas Analyzer ...
Page 57: ...Specifications 2 29 ...
Page 58: ...2 30 Model 920 Multi Gas Analyzer ...
Page 59: ...Specifications 2 31 ...
Page 71: ...Installation and Start Up 3 11 Figure 3 4 Optical Bench Measuring Cell assembly ...
Page 108: ...3 48 Model 920 Multi Gas Analyzer This page intentionally left blank ...
Page 173: ...Controller User Interface 4 65 Figure 4 8 Customer signal connections ...
Page 187: ...Maintenance and Troubleshooting 5 11 Figure 5 1 Measuring Cell assembly ...
Page 262: ...A 2 Model 920 Multi Gas Analyzer Ribbon Cable Interconnect WX 102836 ...
Page 263: ...Appendix A Drawings A 3 GP Lower Enclosure to Electronics Wiring CE Analyzers WX 102810 ...
Page 264: ...A 4 Model 920 Multi Gas Analyzer Heater and Sensor Wiring GP Div 2 Analyzers WX 102851 ...
Page 265: ...Appendix A Drawings A 5 Heater and Sensor Wiring CE Zone 1 Analyzers WX 102852 ...
Page 266: ...A 6 Model 920 Multi Gas Analyzer Lower Cabinet Wiring CE GP Analyzers 120V 100 1341 3 ...
Page 267: ...Appendix A Drawings A 7 Lower Cabinet Wiring CE GP Analyzers 240V 100 1342 3 ...
Page 268: ...A 8 Model 920 Multi Gas Analyzer Signal Wiring PD GP Div 2 CE Zone 1 Analyzers WX 102815 ...
Page 271: ...Appendix A Drawings A 11 24V Power Supply DC Wiring CE Zone 1 Analyzers WX 102812 ...
Page 272: ...A 12 Model 920 Multi Gas Analyzer RS 232 Communications Cable Wiring 300 9480 ...
Page 273: ...Appendix A Drawings A 13 RS 232 RS 485 Module Wiring CE Zone 1 GP Div 2 Analyzers 100 2185 ...
Page 274: ...A 14 Model 920 Multi Gas Analyzer Microcontroller Board 100 0117 ...
Page 275: ...Appendix A Drawings A 15 Host Controller Board Display Interface 100 0138 ...
Page 278: ...S 2 Model 920 Multi Gas Analyzer This page intentionally left blank ...