OPERATIONAL SAFETY

METAL CONDUCTS ELECTRICITY:  

Do not use this equipment where contact may be made with power lines or other live electrical circuits.

FAILURE TO UNDERSTAND AND FOLLOW ALL SAFETY RULES AND ASSEMBLY INSTRUCTIONS 

COULD RESULT IN SERIOUS INJURY OR DEATH.

READ BEFORE BEGINNING ASSEMBLY.

WWW.METALTECH.CO

1 800 363-7587

LAVAL, QUEBEC, CANADA H7L 3N6

Customer Service:  1 800 363-7587

Our customer service staff is available to help you. For help with product assembly, to report damaged or missing parts, or for any other 

information about this product, please call our toll-free number.

KEEP THIS MANUAL FOR FUTURE REFERENCE

Keep this manual and the original sales invoice in a safe, dry place for future reference.

REQUIREMENTS FOR ACCESS FRAME 

SCAFFOLDING

  A scaffold must be erected, altered, and dismantled 

by qualified workers or under the direct supervision of 

a qualified person. The qualified person must ensure 

that the erection is carried out properly, and that the 

correct components and materials are being used. All 

equipment must be inspected before use to ensure that 

it is in good repair and suitable for the intended use.

  The base must be firm and level enough to support the 

load of scaffolding, workers, and materials. Sills and 

base plates are required on any soil or unstable ground 

condition, or where any levelling adjustment is needed. 

The sill must be sound, rigid, and capable of supporting 

the maximum loads without settlement or deformation.

  Levelling jack base must be adjusted within the limits 

specified by the local regulation.

  The frames must be plumb and level and spaced to 

adequately support the loads.

  If uplift could cause the components to separate, 

locking pins must be used and the components 

secured. Uplift might be caused by the action of wind on 

a secured deck or by the leverage action of a cantilever 

side bracket on the scaffolding. All joints must be 

pinned on rolling scaffoldings and free-standing towers.

  With a rolling scaffolding or free-standing tower, the 

platform height must not exceed three times its smallest 

base dimension (3 to 1 rule).

  A scaffolding built above the 3 to 1 rule must be 

effectively guyed or secured to a building or structure 

to prevent overturning. The guying of a scaffolding may 

require the direction of a professional engineer.

  Guardrails must be installed on all open sides of the 

platform where a person could fall a distance of 10 ft. 

or more. The top rail must be placed 40-44 in. above 

the work surface. An intermediate rail must be placed 

halfway between the top rail and the toeboard, if one is 

provided, or halfway between the top rail and the work 

surface if no toeboard is provided.

  Toeboards must be installed on all the open sides of a 

platform where it is possible for tools and or materials 

to roll off. The top of the toeboard must be at least 4 in. 

above the platform. If loose materials are to be stacked 

above the height of the toeboard, then the toeboard 

must be increased in height or mesh panels must 

be installed to prevent materials from falling off the 

scaffolding.

BEFORE ERECTING ACCESS FRAME 

SCAFFOLDING

  What will the scaffolding be used for? For example, light 

duty (one or two workers; painting a wall), or heavy duty 

(several tradespersons, with large and heavy materials 

on the platform)?

  How high will the scaffolding be? Will it be erected in 

one operation or as the work progresses?

  Is the ground firm? Can it support the loads from the 

scaffolding, workers, and materials on it?

  Will the scaffolding need to be tied in? How will this be 

done? Will the ties be moved as the work progresses?

  Is the scaffolding likely to be covered or enclosed as a 

protection against the elements? Is there provision for 

adding additional ties to the adjoining structure?

  What will be the method of access and egress? For 

example, a sloping ladder, vertical ladder, built-in 

stairway, or direct from the floors of the building 

structure?

  On a multi-level scaffolding, how many levels will be 

loaded with materials at one time? Will an engineer 

be required to make the calculations for the total 

anticipated loading and possibly design the scaffolding 

and the sills?

  If a rolling scaffolding is required, consider ground 

surface, height restriction (3 to 1 rule) hazards when 

moving (such as power lines, projections from the build-

ing, and potholes).

EQUIPMENT INSPECTION

YOU MUST INSPECT THE EQUIPMENT YOU PLAN TO USE 

TO MAKE SURE THAT IT IS IN GOOD REPAIR AND SUITABLE 

FOR THE JOB. CHECK THE FOLLOWING:

  Sills: suitable size and strength for the loads. Not split or rotten.
  Frames: no cracks in the welded joints. No kinks or dents in 

the top or bottom cross-members. Legs plumb and square 

with the cross-members. Brace locks in good working order. 

Coupling pins in place and secured to the frame.

  Cross braces and diagonal braces: straight with no bent ends. 

Pivot connection in good working order. No excessive rust.

  Scaffold planks: no split ends, saw cuts, notches, 

protruding nails, excessive warping. No contamination that 

may affect the integrity of the plank, such as oil, chemicals, 

and burns. (If you have any doubts about the strength of 

the plank, you may need to have it load-tested).

  All aluminium or with plywood deck platforms: not mis-

shaped or cracked. Locks working. All bolts and screws in 

place. No burns or broken ends. If upper surface has non-

skid coating, no rot or plywood separation on underside.

  Side or end brackets: hook-on attachment not distorted. 

No cracks in welds. No dents, kinks, or any signs of abuse.

  Guardrails: straight, with no kinks, dents, or excessive rust.
  Casters: same size and from same manufacturer. Wheel 

rotates well and the swivel below the stem is working. Brake 

mechanism works properly. Wheel tread has no damage.

  Levelling jacks: no cracks in weld where levelling jack is 

attached to the top of the caster. No thread damage. No 

curling or warping of the base plate. Adjusting nut is a tight fit.

  Other equipment: inspect any other equipment in the 

frame structure. Damaged equipment should be tagged 

and marked as not fit for use. Inform the supervisor so 

that others do not use it.

IN-MFT5710-EN-01