MetalTech M-MFT51010 Operational Safety And Assembly Instructions Download Page 3

5

6

 

Install the 3 aluminium platforms at the same level.

  

Secure the platforms to the frames using the locks 

beneath the platforms.

  

Insert coupling pins on top ends of the frames.

  

Install the guardrail posts onto the coupling pins seated 

on top of the frames.

  

Put a pig tail lock through the top and bottom of each 

coupling pin to avoid any separation.

7

 

 Attach the guardrails to the posts on all the  

exposed sides.

8

 

 Install toeboards as required. The gap between the 

bottom of the toeboard and the top of the platform 

must not be more than 1/2 in (13 mm).

Reviews: