
2
Table of Contents
Connection of boiler to heating installation in closed-loop system (additional option) .... 16
Confirmation of performance of inspection, guarantee repair, maintenance service:
Warranty Card for the steel boilers, central heating water boilers
........................................... 45
List of tables
Description of schematics
Schematic 16.4 Connecting the boiler to the heating system with Laddomat and buffer .......... 15
Schematic 17.1 Safety schematics of the boiler with the cooling coil and thermal protection .. 16
Schematic 19.1 Electrical schematics for connecting the boiler– controller GOLD II and
Schematic 19.2 Electrical schematics for connecting the boiler – additional B MODULE. .......... 19
Summary of Contents for SEG BIO 100
Page 31: ...30 TROUGH BURNER...
Page 42: ...41 11 12 13 14 15 16 17 18 19 20 21...
Page 43: ...42...
Page 45: ...44...
Page 47: ...46...
Page 49: ...48...