METAL-FACH
Heating Technology
6
Boiler equipment
(User)
The scope of delivery includes both basic and additional components, depending on the order. During
acceptance, the product must be carefully examined to ensure that it has not been damaged during transport
and that the equipment is complete. The elements included in the basic and additional equipment are described
below.
Basic equipment:
Unit of
measurement
Quantity
Central heating boiler
pcs.
1
Ash drawer
pcs.
1
Tools for cleaning the boiler:
●
poker
●
brush
pcs.
1
Thermometer
pcs.
1
Additional equipment:
Unit of
measurement
Quantity
Draught metering device
pcs.
1
Documentation:
Technical and propulsion documentation for the boiler
pcs.
1
NOTE!
METAL-FACH reserves the right to make changes to the technical parameters,
equipment and specifications of the goods offered without prior notice.
Summary of Contents for SE MAX II
Page 2: ......
Page 34: ...METAL FACH Heating Technology 32...
Page 40: ...METAL FACH Heating Technology 38...
Page 42: ...METAL FACH Heating Technology 40...
Page 44: ...METAL FACH Heating Technology 42...
Page 51: ......