background image

METAL-FACH 

Heating Technology 

 

 

40 

 

 

 

Summary of Contents for SE MAX II

Page 1: ...Technical and operating documentation SE MAX II Original instructions edition 01 2022 English language...

Page 2: ......

Page 3: ...eating system 19 Requirements for the expansion vessel 24 Connection of the boiler to the electrical installation 25 Connecting the boiler to the chimney 25 Commissioning the boiler 27 When using the...

Page 4: ...are supervised or instructed by a person responsible for their safety Operation by children is prohibited Symbols used in the manual NOTE Very important information always familiarise yourself with it...

Page 5: ...on the left or right with your order Carefully read the instruction manual it contains the information you need to use your boiler correctly In the case of any problems encountered please contact the...

Page 6: ...cerning the appliance contained in this Technical and Operating Documentation the Warranty Conditions and the generally applicable legal provisions The boilers are delivered assembled They are set up...

Page 7: ...r reaches efficiency of 81 Correct operation and achieving the full capacity of the boiler depend on the quality of the executed installation appropriate chimney draught correct operation and maintena...

Page 8: ...the basic and additional equipment are described below Basic equipment Unit of measurement Quantity Central heating boiler pcs 1 Ash drawer pcs 1 Tools for cleaning the boiler poker brush pcs 1 Therm...

Page 9: ...and 4 mm for other components S235JR N SEMAX II 15kW boiler 1 Boiler casing 2 Thermal insulation 3 Boiler body 4 Fan attachment 5 Supply spigot 6 Flue gas damper 7 Flue 8 Return spigot 9 Blow up windo...

Page 10: ...spigot 6 Flue 7 Return spigot 8 Blow up window 9 Movable grate 10 Water grate 11 Grid doors 12 Thermometer 13 Sockets for temp sensors 14 Air vent spigot 15 Lever for the redrawing 16 Air dispenser 1...

Page 11: ...penser adjustment knob 7 Secondary air damper 8 Air vent spigot 9 Thermometer 10 Movable grate lever 11 Boiler body 12 Water grate 13 Movable grate 14 Blow up window 15 Ashtray 16 Flue gas damper 17 B...

Page 12: ...2 19 Area that can be heated m2 80 80 120 150 150 200 Water capacity L 30 41 56 71 Maximum operating pressure bar 1 5 1 5 1 5 1 5 Maximum operating temperature C 80 80 80 80 Test pressure bar 4 4 4 4...

Page 13: ...be heated m2 210 270 270 320 320 380 Water capacity L 87 93 111 Maximum operating pressure bar 1 5 1 5 1 5 Maximum operating temperature C 80 80 80 Test pressure bar 4 4 4 Length of billets cm Firewoo...

Page 14: ...ating Technology 12 Boiler dimensions User Installer NOTE Boiler feet are present SE MAX II 15 to SE MAX II 50 Their height is 30 mm Dimensions of the SE MAX II 15kW boiler Dimensions of the SE MAX II...

Page 15: ...0 1090 F 383 435 547 671 671 671 671 G 3 4 3 4 3 4 3 4 3 4 3 4 3 4 H 1 5 1 5 1 5 1 5 1 5 1 5 1 5 I 160 160 180 180 180 180 180 J 1 5 1 5 1 5 1 5 1 5 1 5 1 5 K 186 190 253 253 253 253 253 L 169 173 241...

Page 16: ...y hard coal of the OI range Hardwoods such as beech hornbeam oak birch alder and ash are recommended The use of coniferous wood is not recommended as it causes burnt boilers and the need for more freq...

Page 17: ...non flammable material with a minimum cross section of 14 x 14 cm with an inlet opening under the ceiling of the boiler room the exhaust duct should be led above the roof and placed near the chimney t...

Page 18: ...r area half of those installed should be operable electrical lighting and an electrical outlet not exceeding 24 V should also be provided in the room there should be a sump in the floor to allow cooli...

Page 19: ...oom will enable the fuel to burn efficiently NOTE Excessive carbon dioxide in the room should be prevented NOTE For more detailed information on the requirements for the construction of a boiler room...

Page 20: ...luded 2 Use a spirit level to level the boiler to the ground If the boiler is in a horizontal position the installation of feet is not required 3 Screw the four feet into the designated holes 4 Use a...

Page 21: ...ard to burn Wood and cement boards fibreglass mineral insulation C1 Hard to burn Beech wood oak wood plywood C2 Medium burning Pine larch and spruce cork sawn wood planks rubber floor coverings C3 Eas...

Page 22: ...nology 20 Boiler connection diagrams for the heating system in accordance with DIN 91 B 02420 Designation Description RO Vent pipe RW Expansion pipe RS Signal tube RP Overflow pipe RB Safety pipe T1 T...

Page 23: ...nology 21 Boiler connection diagrams for the heating system in accordance with DIN 91 B 02420 Designation Description RO Vent pipe RW Expansion pipe RS Signal tube RP Overflow pipe RB Safety pipe T1 T...

Page 24: ...er 6 Heating circuit 7 Central heating pump C O 8 Domestic hot water DHW pump 9 Buffer 10 Laddomat Designation Description T Temperature sensor Tk Boiler temperature sensor Tz Outdoor temperature sens...

Page 25: ...er 6 Heating circuit 7 Central heating pump C O 8 Domestic hot water DHW pump 9 Buffer 10 Laddomat Designation Description T Temperature sensor Tk Boiler temperature sensor Tz Outdoor temperature sens...

Page 26: ...and an overflow pipe and connected vent The diameter of the vent pipe and overflow pipe is at least mm boiler output kW The most important requirements for safety devices are as follows The expansion...

Page 27: ...kW Connecting the boiler to the chimney Installer Smoke ducts Flue pipes have the task of reliably drawing the flue gases to the outside and drawing in the air that allows the fuel to burn The chimne...

Page 28: ...nected to the chimney by means of a flue and a flue pipe The flue is made up of pipes and fittings that are laid indoors Flue pipes comply with the fire safety requirements for chimneys and are often...

Page 29: ...ht is most often encountered when the boiler is started up for the first time or after a long break in operation when the boiler and chimney have cooled down To check the chimney draught place a lit p...

Page 30: ...e boiler it is recommended to maintain the temperature of the 180 C of flue gas above ambient temperature and the boiler water temperature should not be below 60 C Maintaining a sufficiently low tempe...

Page 31: ...e boiler must not be overheated in any way during operation Do not place flammable objects on the boiler or in its immediate vicinity When removing ashes flammable materials must not be within 150 cm...

Page 32: ...n of the boiler preferably every 100 h of boiler operation Thorough cleaning of the boiler should be carried out once a month Instructions for disposal of the boiler at the end of its service life Use...

Page 33: ...ore you call for service read the frequently asked questions Online application www metalfachtg com pl zglos problem online Hotline 48 85 711 94 54 ext 17 Instructional videos www youtube com c METALF...

Page 34: ...METAL FACH Heating Technology 32...

Page 35: ...the device is provided by the manufacturer also referred to as the Guarantor Jacek Kucharewicz conducting business under the name Metal Fach Jacek Kucharewicz 16 100 Sok ka 66 Sikorskiego Street NIP...

Page 36: ...ard and send the start up report to the Guarantor The first start up of the boiler is a chargeable service and its cost is covered by the User 6 Carrying out annual inspections of the appliance in acc...

Page 37: ...the device under warranty immediately preferably within 7 days from the date of noticing the defect The report can be made directly at the Seller or at the Guarantor www metalfachtg pl zglos problem o...

Page 38: ...CH Heating Technology 36 Confirmation of inspection warranty repair maintenance service L p Date of implementation Description of the activities carried out Signature and stamp of the contractor 1 2 3...

Page 39: ...METAL FACH Heating Technology 37 L p Date of implementation Description of the activities carried out Signature and stamp of the contractor 8 9 10 11 12 13 14...

Page 40: ...METAL FACH Heating Technology 38...

Page 41: ...EN ISO 12100 2012 Safety of machinery Basic concepts general principles for design Part 1 Basic terminology methodology 3 PN EN 1708 1 2010 Welding basic solutions for steel welded joints Part 1 Pres...

Page 42: ...METAL FACH Heating Technology 40...

Page 43: ...n the warranty terms and conditions in accordance with the Personal Data Protection Act of 29 August 1997 consolidated text Journal of Laws 2014 item 1182 The user has the right to access the content...

Page 44: ...METAL FACH Heating Technology 42...

Page 45: ...ied calling of the service team or failure to meet points 1 or 2 each started hour of the service technician s work 70 PLN net travel 1 PLN net km round trip 4 The legible signature of the applicant c...

Page 46: ...text Journal of Laws 2014 item 1182 The user has the right to access the content of his her personal data to correct it to request the cessation of data processing and to object to data processing in...

Page 47: ...chapter Connection of the boiler with the heating system are complied with The conditions contained in the DTR in the chapter Requirements for the expansion vessel are observed There is no other heat...

Page 48: ...ity under the name Metal Fach Jacek Kucharewicz 16 100 Sok ka ul Sikorskiego 66 NIP 545 100 10 62 telephone 48 85 711 94 56 for the purpose of implementing the provisions contained in the warranty ter...

Page 49: ...chapter Connection of the boiler with the heating system are complied with The conditions contained in the DTR in the chapter Requirements for the expansion vessel are observed There is no other sour...

Page 50: ...ity under the name Metal Fach Jacek Kucharewicz 16 100 Sok ka ul Sikorskiego 66 NIP 545 100 10 62 telephone 48 85 711 94 56 for the purpose of implementing the provisions contained in the warranty ter...

Page 51: ......

Page 52: ...ACHTechnikaGrzewcza On line form https b2b metalfachtg com pl commission createFromShortcut shortcut_id 2 Producer METAL FACH Jacek Kucharewicz st Sikorskiego 66 16 100 Sok ka NIP 545 100 10 62 REGON...

Reviews: