ROHRTEST-4, v. 8.8 MESSEN NORD GmbH
page 42
7.2.
Tests with measuring-equipment HIGH PRESSURE (DIN EN 805)
7.2.1. Preparatory works
It becomes implied that already cut off the pipeline-section to be tested, with water
filled and was aired.
Since the high pressure-test one-closes a checkup on air-freedom in general, is to be
dedicated special attention to this criterion in order to avoid verifications.
As in the test standard executed, the pipeline is to be anchored expediently.
−
Connect the control unit to the power supply and to mesuring equipment
−
By the menu-point "H" from the menu-strip, the high pressure-test is selected.
−
Test parameters in accordance with the input-masks write down, after
confirmation, the test windows appears
Control unit
RT4-ST04
Measuring equipment
HIGH RESSURE
Summary of Contents for ROHRTEST-4