ROHRTEST-4, v. 8.8 MESSEN NORD GmbH
page 22
5.
Installation
5.1.
Installation and Starting up
•
Put the control unit ST04 on the suitcase-acreage and open the suitcase-cover,
post the suitcase-cover
•
Remove the cap from the connection-socket “supply” and connect the supply-
cable "230V AC", you bolt the clutch
•
Connect the power plug to an as prescribed installed protection-contact-socket
(230V AC)
•
Switch the main-counter on position in "1", (230V AC) the control-ads "12V DC"
and "24V DC" now must shine, the control-ad "controllers" must with a frequency
of about. 1 Hz blink
•
Now connect the measuring-equipment, which you want to use, to the connection
"equipment" and proceed, as described in section 7 further
Summary of Contents for ROHRTEST-4
Page 64: ......