9
ASSEMBLY OF PRODUCT
n
Wall must be flat, straight and have sufficient bearing capacity.
n
Depth of drilling holes must comply with the length of bolts.
n
The nuts and dowels provided are suitable for brick walls. For
other construction material (e.g. drywall, plate, porous con-
crete), suitable fixing dowels and nuts shall be used.
Fig. 11
DANGER!
Before drilling, ensure that there are no power, gas
or water pipes in the close proximity of the drilling
locations.
1.
Draw a mid location line from the ceiling perpendicular to the
lower edge of the hood (Fig. 11).
2.
There is a tab in the middle of the flue connection plate.
Place the middle point of this tab on the line that is drawn
perpendicular to the wall. Align horizontally and mark the
holes where the connection plate will be mounted via a pen
Drill the marked points with Ø6mm drill and insert 2xØ6mm
plastic dowels in the drilled holes (Fig. 11/a).
Fix the flue connection plate to the wall with 3,9x22 screws
3.
To drill the suspension holes of the flue, place the mounting
template on the surface where the appliance will be mounted
on and mark the mounting holes (Fig. 11/b).
Checking the Wall
ASSEMBLY OF PRODUCT
16.02.2022
HOOD USER GUIDE ENGLISH
19