-7-
U.motion Client Touch 7
Technical Manual
A3. Scope of delivery
Hardware:
U.motion Client Touch 7
U.motion Touch 7 Design element
Fixing set to be used with mounting set
Retention screw
RJ45 Connector
RJ45 Patch cable
Recovery microSD card
Software:
Pre-Installed, fully functional operating system
Documentation:
Safety notes / General notes
Quick Start Guide
U.motion USB Stick: documentation and software
Note
: Please refer to chapter C of this manual which contains important information about the
installation of the OS.
B.
C
OMMISSIONING
B1. Grounding
The following must be heeded to ensure that all electrical interference is safely absorbed:
All data cables connected to the unit must be shielded.
The shields must be grounded at both ends. A low-impedance connection must be established between the
linked units. High compensation currents over the cable shields caused by potential differences must be
excluded.
B2. Commissioning
Power supply of the U.motion Client Touch 7 is granted either through “Power over Ethernet” or through DC
input on DC in plug. Using DC input, the power supply needs to provide safety extra-low voltage (SELV) and
has to be EN60950-1 par.2.5 compliant. If using PoE ensure that your switch, injector or power adapter is fully
PoE compliant.
Power consumption of the device is defined in the technical documents.
More technical details of the power supply can be found in section D2.
Caution!
Pull out the power plug before opening the unit. Check all cable connections before
commissioning the system. Make sure that all voltages and signals meet the specifications.