background image

5.   Remove the Hex Lock Nut (C) and Washer (D) housed within 

the Wooden Gearbar Block on the inside rail, closest to the 
front end of the Reformer first, using the supplied 9/16" 
Socket with Handle as per [Fig B]. To prevent the Flat Head 
Hex Bolt from spinning, test the 3/16” Hex Key and the 5/16” 
Hex Key in the Flat Head Bolt as shown in FIG. B.1, select the 
one that is most snug and insert the Hex Key into the Bolt as 
shown in [FIG B–STEP 5].

6.    Remove the Hex Lock Nut (C) and Washer (D) housed 

within the Wooden Gearbar Block, using the supplied 9/16" 
Socket with Handle as per [FIG B]. To prevent Swing Arm Pin 
Fastener from spinning, secure the flat ends with the 3/4" 
Open Ended Wrench as shown in [FIG B–STEP 6]. 

9.   Insert the 

new

 Swing Arm Pin Fastener with the pre-set 

Plastic Shim and blue tip (A) through the rail slowly,  
as shown in [FIG E].

10.  Place inside Metal Flat Washers (D) on the 

new

 Swing Arm Pin 

Fastener and the Flat Head Hex Bolt as per [FIG F]. Slide the 
Wooden Gearbar Block into the rail on the Swing Arm Pin Fastener 
and Flat Head Hex Bolt [FIG F].

11.  Using the supplied 9/16" Socket with Handle, reattach the outside 

Washer (D) and Hex Lock Nut (C) in the Wooden Gearbar Block on 
the inside rail, closest to the front end of the Reformer by turning 
clockwise. To prevent Bolt from spinning, insert the Hex Key used 
in Step 5 (the one with the best fit) into the Flat Head Hex Bolt as 
shown in [FIG F].

12.  Using the supplied 9/16" Socket with Handle, replace the outside 

Washer (D) and Hex Lock Nut (C) on the Swing Arm Pin Fastener 
in the Wooden Gearbar Block. To prevent Swing Arm Pin Fastener 
from spinning, secure the flat ends with the 3/4" Open Ended 
Wrench as per [FIG F].

To Reassemble

StEPS 5, 6 & 7

StEPS 10, 11 & 12 

StEP 9

StEP 8

FIG. C

FIG. D

FIG. B

(D)

(D)

(D)

(D)

(C)

(C)

StEP 5

StEP 6

StEP 7

FIG. F

(D)

(D)

(D)

(D)

(C)

(C)

StEP 11

StEP 12

7.   Gently remove Wooden Gearbar Block from the rail and place it 

and all hardware to the side.

8.   To remove the Swing Arm Pin Fastener from the rail, position the 

Push Tool into the dimple of the threaded end of the Swing Arm 
Pin Fastener and gently tap against the Push Tool until the Swing 
Arm Pin Fastener is fully released as per [FIG C & FIG D]. Take 
care to not hammer against the aluminum rail.

 

 NOTE: Discard the 

old

 Swing Arm Pin Fastener and Plastic Shim. 

New Hardware supplied.

(A)

FIG. E

FIG. B.1

StEP 10

Summary of Contents for V2 MAX PRO

Page 1: ... Please review this important replacement information for the Swing Arm Pin Fastener on your MERRITHEW SPX Max or V2 Max Reformer For video assembly instructions visit merrithew com sapfr assembly FOR V2 MAX PRO REHAB SPX MAX REFORMERS ...

Page 2: ...n In a counter clockwise direction remove the Socket Head Bolt G and Washer F from the Swing Arm Pin Fastener with the 1 4 Hex Key To prevent it from spinning secure the flat ends of the Swing Arm Pin Fastener with the 3 4 Open Ended Wrench as shown in FIG A Set aside Washer F to be reattached later Socket Head Bolt G to be replaced with new Socket Head Bolt B supplied Keep Swing Arm Assembly on t...

Page 3: ...sing the supplied 9 16 Socket with Handle reattach the outside Washer D and Hex Lock Nut C in the Wooden Gearbar Block on the inside rail closest to the front end of the Reformer by turning clockwise To prevent Bolt from spinning insert the Hex Key used in Step 5 the one with the best fit into the Flat Head Hex Bolt as shown in FIG F 12 Using the supplied 9 16 Socket with Handle replace the outsid...

Page 4: ...nsure the Chrome Adjuster Bar is resting level in the J hooks on both sides 17 Repeat steps 1 to 16 on the other side 18 Tighten all hardware As shown on the SPX Max E F B G H StEP 13 P00230 PM P00230 JAN16 Trademark or registered trademark of Merrithew Corporation used under license Printed in Canada All rights reserved 2200 Yonge Street Suite 500 toronto ON M4S 2C6 phone 416 482 4050 fax 416 482...

Reviews: