background image

Lift door onto positioning aids. Secure the moving panel in place with the door 
holding seal SP010SP281000.

Loosely fix hinges to wall starting at the top. If needed insert packers provided 
behind hinge plate to ensure even gap from top to bottom between closing edge 

of door and Inline panel.

Ensure gap is between 6mm and 9mm then fully tighten the wall hinge screws.

Step 18

Step 19

11

12

INSIDE

INSIDE

6-9mm

To remove bottom positioning aids open door outwards.

Step 20

Measure distance between the wall and edge of inline panel. Cut infill seal on the 
inline panel side to this length. Note the notched end of the seal is to be fitted to the 

wall and the vertical fin is to the front.
Apply a dab of silicone to both ends, insert to bottom profile.

Step 21

INSIDE

21B

21D

21C

21A

Summary of Contents for ARYSTO COLOUR GHH1000H

Page 1: ...779 1576 www merlynshowering com To download the Declaration of Performance DOP for this product please use the link below https merlynshowering com aftersales support dop certs MERLYN Merlyn Industr...

Page 2: ...x2 MG6x30PLUG x2 1 1 x2 x2 2 1 3 4 6 7 2 5 8 10 11 14 12 13 No QTY Part No No QTY Part No 1 2 3 4 5 6 7 9 10 1 1 10 2 1 1 1 1 12 13 14 MGVC32LSET LSET 8 2 MG8x65PLUG 15 16 17 18 1 1 1 MGST5X65 GMGDPA...

Page 3: ...op and bottom to determine correct orientation of panel Top 250mm Bottom 275mm THIS WAY UP Step 2 Assemble the bottom track corner bracket and end brackets on the tray The gap between the ends of the...

Page 4: ...ure the wall plugs are flush with the tile Step 8 Fix the wall brackets making sure to have the wall bracket in the center of the hole in the glass IMPORTANT This is critical as it is where the panel...

Page 5: ...you peel off the protective strip from the tape dry fit the panels ensuring outside edge of inline panel is flush to outside face of side panel 13C Lean inline panel away from fixed side panel and pee...

Page 6: ...cket and push firmly into position Fully tighten grub screws once in position fix corner bracket Place locating aids on threshold one each side of opening Lift door onto locating aids Step 16 locating...

Page 7: ...el Ensure gap is between 6mm and 9mm then fully tighten the wall hinge screws Step 18 Step 19 11 12 INSIDE INSIDE 6 9mm To remove bottom positioning aids open door outwards Step 20 Measure distance be...

Page 8: ...ndle to the door AC07 Left and right hand seal kits A are provided determine handing and use appropriate seal kit Left hand model shown below Push on longest seal between hinges onto back edge of movi...

Page 9: ...ent To adjust door to get required contact against closing seal first support door with door locating aids Loosen all bolts fixing both hinges to glass and move by required amount Tighten all bolts an...

Page 10: ...ile including where the bottom track meets the end brackets Sealing your enclosure 24 h Make sure all surfaces are thoroughly cleaned and dry before applying sealant Merlyn Industries Ltd MER01 20 EN...

Reviews: