6
15
S6LC83291871
S6LC83291805
S6LC8431
Bottom
roller
Bottom
rail
Top
roller
Top
rail
push
down
10
14
V2101L/R
V2104
ensure
the
top
rail
is
level
then
go
on
to
step 12
FINISHING
Outside
S6HDLEP7
S6HDLEP6
S6HDLEP1
S6HDLEP3
S6HDLEP4
S6HDLEP2
S6HDLEP5
11
Loosen nut ½ turn
to adjust
Inside
S6HDLEP7
13
Step 12.
Drill through upright and wall profile in 3 places, top to bottom as shown.
Step
13.
If the moving panels are not closing correctly, or there is any gap between
the magnets,
adjust the roller by first loosening the nut behind the
roller
slightly (max half turn).
Then adjust screw at the top of the roller
and tighten nut. Ensure bottom rollers are running properly in the bottom
track
V6115
12
V4110
V2114
V2115
Step
10.
Hang
the
moving
panel
to
the
top
rail
,
then
push
the
bottom
rollers
bottom rail.
Ensure
handle
is
towards
flat
fixed
panel
.
into
the
NOTE
: