Section 6 - Storage
90-865253070 JUNE 2007
Page 77
5. Pull lever on air pump (vertical) to lock pump on the fitting.
8293
b
d
e
a
c
a -
Actuator fitting
b -
Green indicators
c -
Manual release valve
d -
Air pump
e -
Lever (locking)
6. Pump air into the system until both green indicators extend and water drains from both
sides of the engine. The port side will begin draining before the starboard side.
7. Immediately remove the blue drain plug from the side of the thermostat housing or the
heat exchanger. This must be removed within 30 seconds to properly vent the cooling
system.
6124
a
b
c
d
6125
a
b
c
d
Closed Cooled Models
Seawater Cooled Models
a -
Blue drain plug location
b -
Blue air pump
c -
Air manifold
d -
Green indicators
Summary of Contents for Black Scorpion
Page 8: ...Page iv 90 865253070 JUNE 2007 ...
Page 36: ...Section 2 Getting to Know Your Power Package Notes Page 28 90 865253070 JUNE 2007 ...
Page 54: ...Section 4 Specifications Notes Page 46 90 865253070 JUNE 2007 ...
Page 78: ...Section 5 Maintenance Notes Page 70 90 865253070 JUNE 2007 ...
Page 98: ...Section 6 Storage Notes Page 90 90 865253070 JUNE 2007 ...