G Terminal Block
(Figure 2)
1.
Remove right side panel and bottom cover.
2.
Remove the wires at the terminal ends, noting
proper wire orientation.
3.
Remove the 2 nuts securing the terminal block
to the wall of the toaster.
4.
Reverse this procedure to install new terminal
block.
(Refer to wiring diagram)
H Gearmotor and Motor Sprocket
(Figures 2 & 3)
1.
Remove right side panel and bottom cover.
(Section A)
2.
Loosen the 4 motor mounting screws and slide
motor to achieve slack in the drive chain.
3.
Loosen set screw on motor sprocket and
remove sprocket.
4.
Remove the 4 mounting screws and lift out
motor.
5.
Disconnect 2 wire leads from motor, one at the
wire connector and the other at the terminal
block.
6.
Reverse this procedure to install the new motor.
(Refer to wiring diagram)
I Drive Chain
(Figures 3, 5 & 6)
1.
Remove right side panel. (Section A)
2.
Loosen, but do NOT remove the 4 mounting
screws. Slide motor to achieve slack in drive
chain and remove chain.
3.
When installing new chain, check for proper
chain orientation and tension.
J Conveyor Shaft Sprocket
(Figures 3, 5 & 6)
1.
Remove right side panel. (Section A)
2.
Remove drive chain. (Section I)
3.
Loosen set screw on hub of sprocket and slide sprocket off
shaft.
4.
When installing new sprocket, make sure set screw rests in
hole of shaft.
5.
Replace drive chain. (Section I)
K Conveyor Belt
(Figures 3, 4 & 7)
1.
Remove right & left side panels. (Section A)
2.
Loosen, but do NOT remove the bearing retainer brackets
on both sides of the toaster.
3.
Loosen, but do NOT remove the tension adjusting brackets
on both sides of the toaster.
4.
Push front conveyor shaft towards the back of the toaster
to loosen belt tension.
5.
Separate the conveyor belt at any link and slide out of
toaster.
6.
When installing new conveyor belt, check for proper link
orientation. (Figure 6)
7.
Starting at front of toaster, slide belt under front shaft and
push towards rear of unit. Bring belt up and over the rear
shaft and pull towards front of toaster. Make sure belt is
resting on both belt support guides. Reconnect links.
CAUTION: Make sure belt is not installed at an angle.
8.
Pull forward on front conveyor shaft until excess slack is
removed.
9.
Tighten tension adjusting brackets and bearing retainer
brackets on both sides of toaster.
4