P 5
Please retain product label and instructions for future reference
Step 8
Place a Roof panel
(No. 3)
onto the front
of the building, making sure the Roof
rests into the gaps of the gable framing.
Make sure the 12mm overhang is at the
apex of the building.
**Do not fix to the Floor until the Roof
is fitted.
3
Pre drill
hole
30mm
screw
Step 9
Place Roof panel B
(No. 5)
onto the rear of
the building, making sure the Roof rests
into the gaps of the gable framing.
Make sure the Roof is flush to the rear of
the building and secure with 6x50mm
screws as shown.
**Do not fix to the Floor until the Roof
is fitted.
10x30mm screws.
Pre drill
hole
20mm
screw
Step 10
Once the Roof and Roof B are on the
building, further secure the roofs
together with a U-channel
(No. 28)
straddling the framing of the Roof and
Roof B, fix with 20mm screws.
**Do not fix to the Floor until the Roof
is fitted.
6x20mm screws.
28
Step 11
Fix the Veranda Upright
(No. 14)
to the
building as shown with 2x50mm screws.
**Do not fix to the Floor until the Roof
is fitted.
2x50mm screws.
Pre drill
hole
50mm
screw
5
14