background image

Step 25

 

Fix the Window Crosses 

(No. 17 & No. 18)

 

into the windows securing with 6x20mm 

screws. 

Further secure the crosses with 10mm at 

each meeting point.

12x20mm screws. 

6x10mm screws.

Pre drill 

hole

10mm 

screw

18

17

17

20mm 

screw

Please retain product label and instructions for future reference

             

P 10

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefully peel

 covering back

It is ESSENTIAL that you apply wood treat

-

ment immediately after the building has 

been assembled.

Summary of Contents for Wessex 03WES1208-V3

Page 1: ...ed but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow Our buildings are pr...

Page 2: ...x2 2 1 3 4 5 6 7 8 Window AI 03FW540X1132 V1 x2 Rail AI 03WESRAIL V3 x2 Master Door AI 03MDFG1720X475 V1 Slave Door AI 03FG1720X475 V1 9 10 11 12 Fascia 1365mm S1295 1385mm angled x4 Window Cross A 50...

Page 3: ...Panels together with 3x50mm screws as shown Do not fix to the Floor until the Roof is fitted 3x50mm screws Pre drill hole 50mm screw Step 3 Fix the Window panel No 8 into position with 3x50mm Plain p...

Page 4: ...fix to the Floor until the Roof is fitted 6x50mm screws Pre drill hole 50mm screw Step 6 Place the Veranda No 4 at the front of the building Do not fix to the Floor until the Roof is fitted 7 8 4 1 2...

Page 5: ...aps of the gable framing Make sure the Roof is flush to the rear of the building and secure with 6x50mm screws as shown Do not fix to the Floor until the Roof is fitted 10x30mm screws Pre drill hole 2...

Page 6: ...the Floor with 4x50mm screws per panel 16x50mm screws Pre drill hole 50mm screw 15 15 15 15 5 3 14 Step 14 Fix the Gable Trims No 16 to the build ing with 2x30mm screws per Trim Fix the Cover Strips...

Page 7: ...hown in the diagram Making sure there is 50mm of overhang Fix to the buildings using evenly spaced felt tacks 140xFelt tacks Felt tacks Step 15 Fix the Rails No 9 to the building as shown with 3x40mm...

Page 8: ...first Door Gable windows come secured within the panel 24x30mm screws Pre drill hole 30mm screw Step 19 Fix 3 Hinges No 23 to each Door No 10 No 11 securing with 4x30mm black screws per hinge Position...

Page 9: ...ews Pre drill hole 20mm screw Step 24 Fix the Turn Buttons No 24 to the top of each door with 1x20mm black screw per Button 2x20mm black screws Pre drill hole 30mm screw 22 22 24 21 Step 23 Fix the Pr...

Page 10: ...point 12x20mm screws 6x10mm screws Pre drill hole 10mm screw 18 17 17 20mm screw Please retain product label and instructions for future reference P 10 AFTER TREATMENT score around protective cover o...

Reviews: