P 5
Please retain product label and instructions for future reference
Step 8
Place the Right Roof
(No. 7)
onto the
building, making sure the Roof rests into
the gaps in the framing on the front and
back panel.
Fix as shown with 6x30mm screws.
Fix the Veranda Upright
(No. 13)
to the
building as shown with 2x50mm screws.
**Do not fix to the Floor until the Roof is
fiitted.
6x30mm screws.
2x50mm screws.
Pre drill
hole
30mm
screw
Step 9
Fix the Gable Trims
(No. 15)
to the build-
ing with 2x30mm screws per Trim.
Fix the Cover Strips
(No. 14)
to the corners
of the building with 3x30mm screws per
trim. The Trims attached to the front of
the building will need to be cut to fit at
angle.
Repeat for the rear of the building.
**Do not fix to the Floor until the Roof is
fiitted.
28x30mm screws.
Pre drill
hole
30mm
screw
Step 10
Fix the building to the Floor with
4x50mm screws per panel.
16x50mm screws.
Pre drill
hole
50mm
screw
Step 11
Fix the Rails
(No. 8)
to the building as
shown with;
- 3x40mm screws through into the
veranda per rail.
- 4x40mm screws through into the
building and into the veranda upright per
rail.
14x40mm screws.
Pre drill
hole
40mm
screw
15
15
7
15
15
8
8
13
50mm
screw
*
Cut down
trims to fit
14
14