
P 4
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Please retain product label and instructions for future reference
Step 4
Fix the corners of the Plain Gable (
No. 4
)
and the Left Window Side (
No. 2
) with
50mm screws as shown in diagram.
Do not secure the building to the floor
until the roof is fitted.
Position the panels so there is equal
spacing between the floor and cladding
on all 4 sides.
3x50mm screws.
Pre drill
hole
50mm
screw
Step 5
Fix the remaining panels (
No. 1
&
No. 3
)
with 50mm screws as shown in diagram.
Do not secure the building to the floor
until the roof is fitted.
Position the panels so there is equal
spacing between the floor and cladding
on all 4 sides.
9x50mm screws.
1
3
Step 6
Place the Ridge Bar (
No. 11
) in between
the door and plain gable. Ensure the top
corners of the support bar are flush with each top
point (see illustration).
Secure in place using a L bracket (
No. 23
)
on eachend and 4x30mm screws per
brace.
8x30mm screws.
4
2
Pre drill
hole
50mm
screw
11
26
23
Pre drill
hole
30mm
screw
Step 7
Fix an Eaves Frame(
No. 14
) to each Roof OSB
(
No. 5
) sheet using 3x30mm screws per eave.
Fix the roof sheets to the roof ensuring they
come together at the top using 40mm screws
directly through the roof sheet at the top.
Make sure to attach the roofs to the ridge bar.
6x30mm screws.
24x40mm screws.
Pre drill
hole
30mm
screw
40mm
screw
14
5
5