background image

P 3

Please retain product label and instructions for future reference

             

Place the 

floor

 on a firm and 

level base, ensure base has 
suitable drainage  free from 
areas where standing water 
can collect.  (See front page on 
base requirements). 

Step 2

1

3 x 50mm screws

DO NOT SECURE THE PRODUCT TO 

THE FLOOR UNTIL AFTER THE 

ROOF HAS BEEN FITTED.

Position the panels so there are 

equal gaps between the floor 

and cladding

Step 3

Fix the corners with 

3 x 50mm screws as in the 

diagram.

4

2

Attach the right gable and a back panel 

together with 3x50mm screws.

3 x 50mm screws

DO NOT SECURE THE BUILDING TO 

THE FLOOR UNTIL AFTER THE 

ROOF HAS BEEN FITTED.

Fix the corners with 

3 x 50mm screws as in the 

diagram.

Position the panels so there are 

equal gaps between the floor 

and cladding

Step 4

Attach the left gable to the back panel  

with 50mm screws.

3

6 x 50mm screws

Step 5

Attach the roof ontop of the gables and 

fix through the framing on the side into 

the gable cladding using 50mm screws.

5

Reviews: