Step 12

Parts needed - No. 19 QTY 6 

Ensuring the roof boards are 

flush at the overhanging side and 

meet at the apex, fix the Eaves 

Frames (No. 19) to the underside 

of the roof boards using 9x40mm 

screws as shown in the 

illustration.

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in product. 

Nevertheless the process of fixing 

the eaves frames is the same.

54x40mm Screws 

40mm 

screw

Pre drill 

hole

28

19

19

19

Step 13

Parts neeeded - No. 12 QTY 84

Place the first floor board (No. 12)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual board.

*Do NOT secure the boards until

the last board has been measured

and cut.

Following the same method as before 

measure the gap between the bottom 

of the tongue (on the last board placed

and the log board.

Using a straight edge mark out the 

measurement onto the last floor board 

(No. 12) and cut along the length 

removing the excess.

**Please note:

 Mark the final board 

2mm under the measurement; This will 

allow the timber to expand and 

contract correctly.

Once all the floor boards are in position 

secure each board into position using 

8x40mm screws.

***Please Note: 

Ensure to screw through 

each of the floor boards into the floor 

bearers.

672x40mm Screws 

40mm 

screw

Pre drill 

hole

*Cut to fit

Summary of Contents for 0634LOG209-V4

Page 1: ...ring excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during exte...

Page 2: ...oard 120x34x5000mm QTY 55 LB34 A 5000 Log Board 120x34x5500mm QTY 2 LB34 AE 5500 Floor Board 121x16x2369mm QTY 84 MB16 2369 Roof Board 121x16x2629mm QTY 108 MB16 2629 Bearer 44x58x2286mm QTY 36 F4458...

Page 3: ...locks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x1356 30mm Screw x 108 P 3 Please reta...

Page 4: ...r end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws P...

Page 5: ...oards No s 5 8 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one Step 4 See Pre Assembly Parts needed No 6 QTY 12 No 7 Q...

Page 6: ...nce IMPORTANT Pre drill before fixing screws Step 5 See Window Assembly Parts needed No 1 QTY 2 Refer to window assembly instructions to assemble windows Step 6 Parts needed No 1 QTY 2 Ensure that the...

Page 7: ...2 No 11 QTY 1 Following the same method outlined in Pre Assembly lay the last two boards No s 8 11 onto the front of the assembly Once in position place the last 2 log board s No 10 onto the plain sid...

Page 8: ...ng a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per bo...

Page 9: ...flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Fo...

Page 10: ...al space 20 20 Pre drill hole 30mm screw trim to fit Step 14 Parts needed No 20 QTY 9 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illu...

Page 11: ...t immediately after the building has been assembled 18 18 Pre drill hole 80mm bolt Step 18 Parts needed No 21 QTY 8 Arrange the storm braces No 21 around the building internally Place 2x storm braces...

Reviews: