![Mercia Garden Products 0634LOG209-V4 General Instructions Manual Download Page 9](http://html1.mh-extra.com/html/mercia-garden-products/0634log209-v4/0634log209-v4_general-instructions-manual_1772582009.webp)
P 9
Please retain product label and instructions for future reference
12
Step 12
Parts needed - No. 19 QTY 6
Ensuring the roof boards are
flush at the overhanging side and
meet at the apex, fix the Eaves
Frames (No. 19) to the underside
of the roof boards using 9x40mm
screws as shown in the
illustration.
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in product.
Nevertheless the process of fixing
the eaves frames is the same.
54x40mm Screws
40mm
screw
Pre drill
hole
28
19
19
19
Step 13
Parts neeeded - No. 12 QTY 84
Place the first floor board (No. 12)
inside the building flush to the log
board on one side. Continue adding
the floor boards (
internally
) making
sure to interlock each individual board.
*Do NOT secure the boards until
the last board has been measured
and cut.
Following the same method as before
measure the gap between the bottom
of the tongue (on the last board placed)
and the log board.
Using a straight edge mark out the
measurement onto the last floor board
(No. 12) and cut along the length
removing the excess.
**Please note:
Mark the final board
2mm under the measurement; This will
allow the timber to expand and
contract correctly.
Once all the floor boards are in position
secure each board into position using
8x40mm screws.
***Please Note:
Ensure to screw through
each of the floor boards into the floor
bearers.
672x40mm Screws
40mm
screw
Pre drill
hole
*Cut to fit