Mercia Garden Products 0634LOG209-V4 General Instructions Manual Download Page 10

P 10

Please retain product label and instructions for future reference

             

HANDLE

WITH CARE

1

2

3

4

Felt 

tacks 

Step 16

Part needed - No. 22 

Cut the felt into seven strips & lay 

onto the roof in the order shown in 

the illustration.

*Ensure there is approximately 

50mm of overhanging felt each 

side.

Once the felt is laid out fix to the 

roof using felt tacks at 100mm

intervals.

*Felt size: 6100mm

488x Felt Tacks

1.

2.

3.

4.

5.

6.

7.

Roof

Closure Trim

Internal

23

*Measure and cut the

closure trims to

fit the internal space.

23

23

Roof

Closure Trim

Internal

20

*Measure and cut the

closure trims to

fit the internal space.

20

20

Pre drill 

hole

30mm 

screw

*trim to fit

Step 14

Parts needed - No. 20 QTY 9 

   

 

Inside the building place the closure 

trim (No. 20) against the boarding 

and align with the roof as shown in 

the illustration. 

Once in position fix each trim 

into place by pre drilling a pilot hole 

and using 6x30mm screws per trim, 

equally spacing them along the face 

of the board.

54x30mm Screws

30mm 

screw

Pre drill 

hole

*Cut to fit

Step 15

Parts needed - No. 20 QTY 9 

Once the floor has been laid arrange the

closure trim (No. 20) around the outside 

edge of floor (internally), measure and cut 

down accordingly to best match the 

internalspace.

Secure each trim section into place using 

6x30mm spaced equally along the board 

as shown in the illustration.

*Do NOT fix the closure trim to the floor-

boards.

54x30mm Screws 

Summary of Contents for 0634LOG209-V4

Page 1: ...ring excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during exte...

Page 2: ...oard 120x34x5000mm QTY 55 LB34 A 5000 Log Board 120x34x5500mm QTY 2 LB34 AE 5500 Floor Board 121x16x2369mm QTY 84 MB16 2369 Roof Board 121x16x2629mm QTY 108 MB16 2629 Bearer 44x58x2286mm QTY 36 F4458...

Page 3: ...locks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x1356 30mm Screw x 108 P 3 Please reta...

Page 4: ...r end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws P...

Page 5: ...oards No s 5 8 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one Step 4 See Pre Assembly Parts needed No 6 QTY 12 No 7 Q...

Page 6: ...nce IMPORTANT Pre drill before fixing screws Step 5 See Window Assembly Parts needed No 1 QTY 2 Refer to window assembly instructions to assemble windows Step 6 Parts needed No 1 QTY 2 Ensure that the...

Page 7: ...2 No 11 QTY 1 Following the same method outlined in Pre Assembly lay the last two boards No s 8 11 onto the front of the assembly Once in position place the last 2 log board s No 10 onto the plain sid...

Page 8: ...ng a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per bo...

Page 9: ...flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Fo...

Page 10: ...al space 20 20 Pre drill hole 30mm screw trim to fit Step 14 Parts needed No 20 QTY 9 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illu...

Page 11: ...t immediately after the building has been assembled 18 18 Pre drill hole 80mm bolt Step 18 Parts needed No 21 QTY 8 Arrange the storm braces No 21 around the building internally Place 2x storm braces...

Reviews: