background image

P 7

Please retain product label and instructions for future reference

             

Step 6

Once you have laid 6 log boards (

off 

of the starter

) up the door section, 

slide the assembled door frame (No. 

2) over the boards resting the frame 

on top of the starter board.

*Please note:

 This image is for illustra-

tive purposes and may differ from 

your choice in product (

regarding 

door position

). Nevertheless the 

process of fitting the door frame is 

the same.

22

22

Step 9 

(See Pre-Assembly)

Parts needed - No. 4 QTY 6

 

 

   No. 5 QTY 6  

 

 

   No. 10 QTY 12

 

 

   No. 11 QTY 6

 

 

   No. 12 QTY 6  

 

 

   No. 22 QTY 12

Following the same method

outlined in 

Pre-Assembly

, lay

the remaining boards (No’s. 4, 5, 

10, 11, 12 & 22) onto the

assembly to bring the board 

level to the top of the window 

and door frames.

Please note when you get to the 

top of the boards the rear-right 

hand boards will be slightly 

lower.

**Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the door 

frame.

Step 7 

(See Pre-Assembly)

Parts needed - No. 4 QTY 6

 

 

   No. 5 QTY 6  

 

 

   No. 10 QTY 12

 

 

   No. 11 QTY 6

 

 

   No. 12 QTY 6  

 

 

   No. 22 QTY 12

   

Following the same method

outlined in 

Pre-Assembly

, lay

the next 6 boards (No’s. 4, 5, 10, 

11, 12 & 22) onto the 

assembly to create your second 

level.

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the door 

frame by 12-13 boards, refer to 

door installation instructions, if 

not, you can install the door at 

step 9.

Step 8

Once you have laid the second

level of boards onto the assembly

slide the window(

s

(No. 1)  between the 

smaller boards and rest on to the 

longer board.

*Ensure the boards are level with

each end.

*Please note:

 This image is for

illustrative purposes and may

differ from your choice in product

(

regarding window position

).

Nevertheless the process of fitting

the window is the same.

5

4

10

10

11

22

22

5

4

10

10

12

11

12

Summary of Contents for 0628LOG136-V4

Page 1: ...nshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all si...

Page 2: ...otch Log Board 28x120x2499mm QTY 1 LB28 JD 2499 1x45 deg cut left 50mm bottom notch window notch Log Board 28x120x2499mm QTY 1 LB28 JDL 2499 1x45 deg cut right window notch Log Board 28x120x2499mm QTY...

Page 3: ...arer 44x44x2509mm F4444 2489 PT Bearer 44x44x2335mm F4444 2355 PT Storm Brace 27x44x2000mm QTY 8 F2744 2000mm 47 48 Closure Trim 16x28x2400mm approx length QTY 14 S1628 2400 Fascia 16x120x4100mm QTY 2...

Page 4: ...TY 1 MB16 P 763 QTY 1 MB16 P 893 QTY 1 MB16 P 1023 QTY 1 MB16 P 1152 QTY 1 MB16 P 1282 QTY 1 MB16 P 1412 QTY 1 MB16 P 1542 QTY 1 MB16 P 1672 QTY 1 MB16 P 1801 QTY 1 MB16 P 1931 QTY 1 MB16 P 2061 QTY 1...

Page 5: ...0x70mm screws ensuring the frame is flush 10x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 37 QTY 7 No 38 QTY 1 No 39 QTY 1 No 40 QTY 1 No 41 QTY 1 Arrange the remaining framing No 37 3...

Page 6: ...m Screws 70mm screw Step 4 See Pre Assembly Parts needed No 6 QTY 1 Make the assembly level by adding another board No 6 as shown in the diagram Fix using 1x70mm screw Ensure to stagger the screws so...

Page 7: ...the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Step 7 See Pre Assembly Parts needed No 4 QTY 6 No 5 QTY 6 No 10 QTY...

Page 8: ...evel and flush with each other as you lay each one Step 13 Parts needed No 19 QTY 1 No 20 QTY 1 Lay the last two boards No 19 20 onto the front of the assembly Fix into position with 2x70mm screws per...

Page 9: ...crews Pre drill hole 70mm screw Step 15 Parts needed No 32 QTY 1 No 33 QTY 1 No 34 QTY 1 Then fix the short front roof truss No 34 to the block in the same way Place and fix the two remaining roof tru...

Page 10: ...of the building 12x70mm Screws Pre drill hole 70mm screw Step 18 You can now fix the assembled roof truss to the building making sure the attached blocks sit inside the assembly Some adjustment may b...

Page 11: ...r of roof boards one by one Once you are happy with the fit of the roof boards fix the boards into place using 2x40mm screws per board ensuring to fix through the roof board into the truss below 22x40...

Page 12: ...he fifth sixth and seventh board of this layer into place as shown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 48x40mm Screws Step 22 Parts n...

Page 13: ...own in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 38x40mm Screws Step 23 Parts needed No 52 QTY 6 No 53 QTY 6 No 54 QTY 3 Continue arranging th...

Page 14: ...shown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 18x40mm Screws Pre drill hole 40mm screw IMPORTANT Pre drill before fixing screws Step 26 P...

Page 15: ...oof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws...

Page 16: ...nsure there is 50mm of overhanging felt around the base of the roof 600x Felt Tacks 1 3 2 4 5 6 7 8 9 10 Step 30 Parts needed No 50 Sealing the felt with felt stamps follow the measurements below 250x...

Page 17: ...o follow the shape of building as shown in the illustration Then attach the other piece in the same way Attach the second fascias No 46 to the front sides of the building in the same way as previously...

Reviews: