background image

P 4

Please retain product label and instructions for future reference

             

Felt Tacks x850

Nail Bag

40mm Screw x472

30mm Screw x84

120mm Screw x11

70mm Screw x88

100mm Screw x 24

70mm Bolt Set x16

Pre-assembly

*Please note: 

Each board interlocks at

either end in a staggered pattern.

Before securing ensure that the boards

are fitted properly in their respective

tongues and grooves.

MB16-P-194 QTY1
MB16-P-410 QTY 1 
MB16-P-626 QTY 1 
MB16-P-842 QTY 1 
MB16-P-1058 QTY 1 
MB16-P-1274 QTY 1
MB16-P-1490 QTY 1
MB16-P-1706 QTY 1
MB16-P-1922 QTY 1
MB16-P-2138 QTY 1
MB16-P-2354 QTY 1
MB16-P-2570 QTY 1
MB16-P-2786 QTY 1
MB16-P-3002 QTY 1
MB16-P-3218 QTY 1
MB16-P-3434 QTY 1
MB16-P-3650 QTY 1
MB16-P-3866 QTY 1
MB16-P-4082 QTY 1

MB16-P-114 QTY 1
MB16-P-244 QTY 1 
MB16-P-374 QTY 1
MB16-P-504 QTY 1
MB16-P-633 QTY 1
MB16-P-763 QTY 1
MB16-P-893 QTY 1
MB16-P-1023 QTY 1
MB16-P- 1152 QTY 1
MB16-P-1282 QTY 1
MB16-P-1412 QTY 1
MB16-P-1542 QTY 1
MB16-P-1672 QTY 1
MB16-P-1801 QTY 1
MB16-P-1931 QTY 1
MB16-P-2061 QTY 1
MB16-P-2191 QTY 1
MB16-P-2320 QTY 1
MB16-P- 2450 QTY 1

MB16-3748mm QTY 20
MB16-P-3748 QTY 1
MB16-P-3644 QTY 1
MB16-P-3532QTY 1
MB16-P-3420 QTY 1
MB16-P-3308 QTY 1
MB16-P-3084 QTY 1
MB16-P-2948 QTY 1
MB16-P-2860 QTY 1
MB16-P-2748 QTY 1
MB16-P-2636 QTY 1
MB16-P-2524 QTY 1
MB16-P-2412 QTY 1
MB16RG52-P-2300 QTY 1

Roof Board Pack 2   QTY 2

AI-06LOGC4X4RBP2-V4

Roof Board Pack 1     QTY 2

AI-06LOGC4X4RBP1-V4

MB16-P-54 QTY 1
MB16-P-195 QTY 1
MB16-P-336 QTY 1
MB16-P-478 QTY 1
MB16-P-619 QTY 1
MB16-P-760 QTY 1
MB16-P-902 QTY 1
MB16-P-1043 QTY 1
MB16-P-1184 QTY 1
MB16-P-1326 QTY 1
MB16-P-1467 QTY 1
MB16-P-1608 QTY 1
MB16-P-1750 QTY 1
MB16-P-1891 QTY 1
MB16-P-2032 QTY 1
MB16-P-2174 QTY 1
MB16-P-2315 QTY 1

Roof Board Pack 3   QTY 1

AI-06LOGC4X4RBP2-V4

54

53

52

51

Floor Board Pack 

AI-0628LOG127RB-V3FBP

Summary of Contents for 0628LOG136-V4

Page 1: ...nshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all si...

Page 2: ...otch Log Board 28x120x2499mm QTY 1 LB28 JD 2499 1x45 deg cut left 50mm bottom notch window notch Log Board 28x120x2499mm QTY 1 LB28 JDL 2499 1x45 deg cut right window notch Log Board 28x120x2499mm QTY...

Page 3: ...arer 44x44x2509mm F4444 2489 PT Bearer 44x44x2335mm F4444 2355 PT Storm Brace 27x44x2000mm QTY 8 F2744 2000mm 47 48 Closure Trim 16x28x2400mm approx length QTY 14 S1628 2400 Fascia 16x120x4100mm QTY 2...

Page 4: ...TY 1 MB16 P 763 QTY 1 MB16 P 893 QTY 1 MB16 P 1023 QTY 1 MB16 P 1152 QTY 1 MB16 P 1282 QTY 1 MB16 P 1412 QTY 1 MB16 P 1542 QTY 1 MB16 P 1672 QTY 1 MB16 P 1801 QTY 1 MB16 P 1931 QTY 1 MB16 P 2061 QTY 1...

Page 5: ...0x70mm screws ensuring the frame is flush 10x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 37 QTY 7 No 38 QTY 1 No 39 QTY 1 No 40 QTY 1 No 41 QTY 1 Arrange the remaining framing No 37 3...

Page 6: ...m Screws 70mm screw Step 4 See Pre Assembly Parts needed No 6 QTY 1 Make the assembly level by adding another board No 6 as shown in the diagram Fix using 1x70mm screw Ensure to stagger the screws so...

Page 7: ...the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame Step 7 See Pre Assembly Parts needed No 4 QTY 6 No 5 QTY 6 No 10 QTY...

Page 8: ...evel and flush with each other as you lay each one Step 13 Parts needed No 19 QTY 1 No 20 QTY 1 Lay the last two boards No 19 20 onto the front of the assembly Fix into position with 2x70mm screws per...

Page 9: ...crews Pre drill hole 70mm screw Step 15 Parts needed No 32 QTY 1 No 33 QTY 1 No 34 QTY 1 Then fix the short front roof truss No 34 to the block in the same way Place and fix the two remaining roof tru...

Page 10: ...of the building 12x70mm Screws Pre drill hole 70mm screw Step 18 You can now fix the assembled roof truss to the building making sure the attached blocks sit inside the assembly Some adjustment may b...

Page 11: ...r of roof boards one by one Once you are happy with the fit of the roof boards fix the boards into place using 2x40mm screws per board ensuring to fix through the roof board into the truss below 22x40...

Page 12: ...he fifth sixth and seventh board of this layer into place as shown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 48x40mm Screws Step 22 Parts n...

Page 13: ...own in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 38x40mm Screws Step 23 Parts needed No 52 QTY 6 No 53 QTY 6 No 54 QTY 3 Continue arranging th...

Page 14: ...shown in the diagram Use 2x40mm screws per board ensuring to fix through the roof board into the truss below 18x40mm Screws Pre drill hole 40mm screw IMPORTANT Pre drill before fixing screws Step 26 P...

Page 15: ...oof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws...

Page 16: ...nsure there is 50mm of overhanging felt around the base of the roof 600x Felt Tacks 1 3 2 4 5 6 7 8 9 10 Step 30 Parts needed No 50 Sealing the felt with felt stamps follow the measurements below 250x...

Page 17: ...o follow the shape of building as shown in the illustration Then attach the other piece in the same way Attach the second fascias No 46 to the front sides of the building in the same way as previously...

Reviews: