background image

IMPORTANT: 

Pre-drill before fixing screws.

IMPORTANT: 

Pre-drill before fixing screws.

P 11

Please retain product label and instructions for future reference

             

A

A

B

C

B

Step 19

Parts needed - No. 50 QTY 2

    

 

   No. 51 QTY 2

 

 

   No. 52 QTY 1 

Place the first board from each roof 

board pack 

(A, B, & C )

 roof board 

onto the roof assembly, working 

around the structure, building 

each layer of roof boards one by 

one.

*

HINT:

 keep the roof board packs 

seperate so as not to mix up the 

positions.

Once you are happy with the fit

of the roof boards fix the boards 

into place using 2x40mm screws 

per board ensuring to fix through 

the roof board into the truss below.

20x40mm Screws used at this stage 

Step 20

Parts needed - No. 50 QTY 6

    

 

   No. 51 QTY 6

 

 

   No. 52 QTY 3

Start arranging the roof board

packs 

(A, B, & C)

 onto the roof 

assembly, working around the 

structure, building each layer of 

roof boards one by one.

*

HINT:

 keep the roof board

packs seperate so as not to

mix up the positions.

Once you are happy with the fit

of the roof boards, fix the 2nd, 

3rd & 4th boards into place 

using 4 screws per board (2 

each side of the board) ensur-

ing the screws fix through the 

roof board into the truss below 

as shown in Step 19.

Repeat this so you have 4 

boards high screwed down in 

total on each of the 5 sides.

50

51

50

51

52

50

51

50

51

52

Pre drill 

hole

40mm 

screw

Pre drill 

hole

40mm 

screw

60x40mm Screws used at this stage

Summary of Contents for 0628LOG127-V5

Page 1: ...nshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all si...

Page 2: ...QTY 1 LB28 J 2028 1x45 deg cut left 50mm bottom notch Log Board 28x120x2028mm QTY 1 LB28 JD 2028 1x45 deg cut left 50mm bottom notch window notch Log Board 28x120x2028mm QTY 1 LB28 ADGL 2028 1x45 deg...

Page 3: ...x44x1361mm QTY 1 F4444 H 1361 PT 2x45 deg cut 1361mm finished Bearer 44x44x1820mm QTY 1 F4444 G 1820 PT 1x45 deg cut 1820mm finished Bearer 44x44x1864mm QTY 1 F4444 G 1864 PT 1x45 deg cut 1864mm finis...

Page 4: ...I 0628LOG127 V3FBP MB16 C 2748 QTY 15 MB16 P 2748 QTY 1 MB16 P 2734 QTY 1 MB16 P 2622 QTY 1 MB16 P 2510 QTY 1 MB16 P 2398 QTY 1 MB16 P 2286 QTY 1 MB16 P 2174 QTY 1 MB16 P 2062 QTY 1 MB16 P 1950 QTY 1...

Page 5: ...r using 10x70mm screws ensuring the frame is flush 10x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 35 QTY 7 No 36 QTY 1 No 37 QTY 1 No 38 QTY 1 Arrange the remaining framing No 35 36 3...

Page 6: ...Screws 70mm screw Step 4 See Pre Assembly Parts needed No 6 QTY 1 Make the assembly level by adding another board No 6 as shown in the diagram Fix using 1x70mm screw Ensure to stagger the screws so a...

Page 7: ...has enclosed the door frame Step 6 See Pre Assembly Parts needed No 4 QTY 6 No 5 QTY 6 No 10 QTY 12 No 11 QTY 6 No 12 QTY 6 No 22 QTY 12 Following the same method outlined in Pre Assembly lay the next...

Page 8: ...o as not to collide with the previous screw Step 13 Parts needed No 19 QTY 1 No 20 QTY 1 Lay the last two boards No 19 20 onto the front of the assembly Fix into position with 2x70mm screws per board...

Page 9: ...the same way Screw down through the purlin at an angle as shown in the diagram using 1x70mm screws 3x70mm Screws Pre drill hole 70mm screw Step 15 Parts needed No 33 QTY 2 Place and fix the remaining...

Page 10: ...nst the wall of the building 6x90mm Screws Pre drill hole 90mm screw Step 18 You can now fix the assembled roof truss to the building making sure the attached blocks sit inside the assembly Some adjus...

Page 11: ...x through the roof board into the truss below 20x40mm Screws used at this stage Step 20 Parts needed No 50 QTY 6 No 51 QTY 6 No 52 QTY 3 Start arranging the roof board packs A B C onto the roof assemb...

Page 12: ...through the roof board into the truss below as shown in Step 19 Repeat this so you have 7 boards high screwed down in total on each of the 5 sides Step 22 Parts needed No 50 QTY 6 No 51 QTY 6 No 52 Q...

Page 13: ...trative purposes only and may differ from your floor 49 50 50 Pre drill hole 40mm screw Step 23 Parts needed No 50 QTY 10 No 51 QTY 10 No 53 QTY 4 Continue arranging the roof board packs A B C onto th...

Page 14: ...oof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws...

Page 15: ...nd lay onto the roof in the order shown in the illustration Secure along the outer edge of each felt section using felt tacks spaced out at approximately 100mm intervals Ensure there is 50mm of overha...

Page 16: ...ding as shown in the illustration Repeat this on the other back side of the building Attach the next size fascia board No 43 to the sides of the building in the same way For the final fascia above the...

Reviews: