![Mercia Garden Products 0628LOG125-V4 General Instructions Manual Download Page 7](http://html1.mh-extra.com/html/mercia-garden-products/0628log125-v4/0628log125-v4_general-instructions-manual_1772654007.webp)
P 6
Please retain product label and instructions for future reference
Pre drill
hole
Step 11
Parts needed - No. 16 QTY 3
Align the roof purlin(
s
) (
No. 16
)
into the cut out slots on each gable top
ensuring each purlin interlocks the
boards.
Secure the purlin at each end by
screwing through the bars into the
boards (
ensure to pre-drill to avoid
the boards splitting
) using 4x70mm
screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the purlins
is the same.
12x70mm Screws
70mm
screw
16
Step 12
Parts needed - No. 12 QTY 94
Place the first two roof
board’s (
No. 12
) onto the assembly
on each side, making sure the
boards are flush to the end of the
roof purlin. Once in position fix to
each purlin using 3x40mm screws
Due to natural occurences of
wood shrinkage / expansion. You
maybe required to use the provid-
ed spacers and place a space of
2mm to ensure every roof board
lines up with the truss’..
*Ensure the roof boards meet
at the top of the apex and leave
an overhang at the bottom.
Continue adding the roof boards
along the roof, fixing each one into
position using 3x40mm screws,
making sure that each board is
interlocked, flush at the bottom &
meet at the top of the apex.
The last board on each side
will overhang: Using a straight
edge and a pencil mark out a line
as a guide.
Cut along the pencil mark and
remove the excess. Place the cut
down board’s back onto the roof
and secure into place using
3x40mm screws per board.
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in product.
Nevertheless the process of
cutting and fitting the last roof
board(s) is the same.
282x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
23b
12
12
12
IMPORTANT:
Pre-drill before fixing screws.
P 7
16
16
16
a
b
a
b
a
b
a
b