![Mercia Garden Products 0628LOG125-V4 General Instructions Manual Download Page 10](http://html1.mh-extra.com/html/mercia-garden-products/0628log125-v4/0628log125-v4_general-instructions-manual_1772654010.webp)
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Please retain product label and instructions for future reference
Step 18
Parts needed - No. 17 QTY 4
Align the fascia’s (
No. 17
)
with the roof and fix into
place using 3x40mm
screws per fascia, making
to screw through the
fascia into the roof purlins
and eaves frame.
*Ensure the angled cuts meet
at the top of the apex.
12x40mm Screws
Pre drill
hole
40mm
screw
17
17
17
17
P 10
Step 19
Parts needed - No. 19 QTY 2
Arrange the storm braces (
No. 19
)
around the building (
internally
).
Place 2x storm braces per side
fixing into place using 2x70mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***It is important that each
bolt is tightened using a
washer so as not to damage
the log boards.
16x70mm Bolt Sets
Pre drill
hole
70mm
bolt
17
17