Mercia Garden Products 0619LOG006-V4 General Instructions Manual Download Page 9

P 9

Please retain product label and instructions for future reference

             

Step 14

Parts Needed - No. 24 QTY 2

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(No. 24) to the underside of the roof

boards using 9x40mm screws as 

shown in the illustration

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

18x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 15

Parts Needed - No. 26 QTY 23

Place the first floor board (No. 26)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Following the same method outlined 

previously, measure the gap between

the bottom of the tongue (on the last 

board placed) and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board (No. 26) and cut along the 

length removing the excess.

**Please note:

 Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 8x40mm screws.

***Please Note: 

Ensure to screw 

through each of the floor boards 

into the floor bearers.

184x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

24

26

Summary of Contents for 0619LOG006-V4

Page 1: ...at the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and...

Page 2: ...2754 Log Board 120x19x1002mm QTY 21 LB19 B 1002 Log Board 120x19x1102mm LB19 BE 1102 Log Board 120x19x1202mm LB19 BE 1202 Log Board 120x19x1302mm LB19 BE 1302 Log Board 120x19x2854mm LB19 AE 2854 Log...

Page 3: ...20x19x326mm QTY 6 LB19 C 326 Log Board 120x19x1000mm QTY 8 LB19 B 1000 Log Board 54x19x1000mm QTY 2 LB19RG54 B 1000 Pre assembly Please note Each board interlocks at either end in a staggered pattern...

Page 4: ...nge the remaining framing No 22 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side of the beare...

Page 5: ...r from your choice in product regarding door position Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door a...

Page 6: ...1 between the smaller boards and rest on to the longer board Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product r...

Page 7: ...Place the gable tops No 3 onto the assembly Fix into position by screwing through the notches as shown in the illustration Ensure that the boards are level and flush with each other as you lay each o...

Page 8: ...king sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You maybe required to use the...

Page 9: ...board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the same...

Page 10: ...ually spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Step 17 Parts needed No 27 QTY 7 Once the floor has been laid arrange the closure trim No 27 around t...

Page 11: ...screw 23 23 23 23 Pre drill hole 60mm bolt Step 20 Parts needed No 28 QTY 8 Arrange the storm braces No 28 around the building internally Place 2x storm braces per side fixing into place using 2x 60m...

Page 12: ...arter board and rest onto the starter frames as shown in the illustration Once in position fix the log board to the inside of the cabin using 2x40mm screws per side The centre starter frame at this po...

Page 13: ...ep 4 Parts Needed No 31 QTY 25 Following the method outlined previously see main instructions place the veranda floor boards No 31 onto the assembly and secure each board into place using 3x40mm screw...

Page 14: ...It is ESSENTIAL that you apply wood treat ment immediately after the building has been assembled P 14 Please retain product label and instructions for future reference...

Reviews: