P 9
Please retain product label and instructions for future reference
Step 14
Parts Needed - No. 24 QTY 2
Ensuring the roof boards are flush
at the overhanging side and meet
at the apex, fix the eaves frames
(No. 24) to the underside of the roof
boards using 9x40mm screws as
shown in the illustration
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in
product. Nevertheless the process
of fixing the eaves frames is the
same.
18x40mm Screws
40mm
screw
Pre drill
hole
Step 15
Parts Needed - No. 26 QTY 23
Place the first floor board (No. 26)
inside the building flush to the log
board on one side. Continue adding
the floor boards (
internally
) making
sure to interlock each individual
board.
*Do
NOT
secure the boards until
the last board has been measured
and cut.
Following the same method outlined
previously, measure the gap between
the bottom of the tongue (on the last
board placed) and the log board.
Using a straight edge mark out the
measurement onto the last floor
board (No. 26) and cut along the
length removing the excess.
**Please note:
Mark the final board
2mm under the measurement; This
will allow the timber to expand and
contract correctly.
Once all the floor boards are in
position secure each board into
position using 8x40mm screws.
***Please Note:
Ensure to screw
through each of the floor boards
into the floor bearers.
184x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
24
26