![Mercia Garden Products 0619LOG006-V4 General Instructions Manual Download Page 12](http://html1.mh-extra.com/html/mercia-garden-products/0619log006-v4/0619log006-v4_general-instructions-manual_1772650012.webp)
P 12
Please retain product label and instructions for future reference
29
a
b
Pre drill
hole
70mm
screw
a
29
29
30
b
32
Step 2
Parts Needed - No. 32 QTY 2
No. 36 QTY 2
Following the method outlined
previously (
see main instructions
)
secure the starter board (No. 32)
onto the smaller frame using
2x70mm screws ensuring to
screw through the notch into the
framing below.
Place the first two log boards
(No. 36) onto the starter board
and rest onto the starter frames
as shown in the illustration.
Once in position fix the log
board to the inside of the cabin
using 2x40mm screws per side.
*The centre starter frame at this
point is not fixed into position,
arrange so there the frame is
central.
4x40mm Screws
2x70mm Screws
70mm
screw
Pre drill
hole
40mm
screw
36
36
32
32
36
Veranda Fit
Step 1
Parts Needed - No. 29 QTY 3
No. 30 QTY 2
Place the first Bearer
(No. 29) up to the
building and fix to the
building starter using
4x70mm screws.
Attach the smaller
bearer frame (No. 30)
to each end of the
larger frame using
4x70mm screws.
8x70mm Screws