
Pre drill
hole
70mm
screw
Step 2
Parts Needed - No. 4 QTY 2
No. 9 QTY 2
Place the starter boards (No. 4)
on to assembled base frame
along the longest sides.
*Ensure the notches at either
end of each board are flush
and level with the ends of the
frame.
Fix each of the starter boards to
the frame by screwing through
the notch into the frame as shown
in the illustration.
Once in position place the next
log board (No. 9) onto the
assembly as shown in the
illustration.
4x70mm Screws
22
22
22
22
22
22
22
22
22
Please retain product label and instructions for future reference
22
21
22
21
22
4
4
9
21
22
9
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
70mm
screw
Step 1
Parts Needed - No. 21 QTY 2
No. 22 QTY 11
Lay the bearers (No. 21 &
No. 22) onto a firm and level
surface (free from areas where
standing water can collect ) as
shown in the illustration.
Fix the framing together at each
corner using 8x70mm screws,
ensuring the frame is flush.
8x70mm Screws
Pre drill
hole
a
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
Pre drill
hole
70mm
screw
b
Following the same
method arrange the
remaining framing (No. 22)
inside the assembled frame.
*Ensure there is an equal
amount of space between
each frame.
Secure each of the frames in
place using 2x70mm screws
for each side of the bearer,
ensuring the framing remains
level.
28x70mm Screws
4
P 4
Example picture
2 screws per bearer per end.