
P 10
Please retain product label and instructions for future reference
HANDLE
WITH CARE
1
2
3
4
Felt
tacks
Step 18
Parts needed - No. 38
Cut the felt into five strips and lay onto
the roof in the order shown in the
illustration.
*Ensure there is approximately 50mm
of overhanging felt each side.
Once the felt is laid out fix to the
roof using felt tacks at 100mm
intervals.
*Felt size: 3030mm
240x Felt Tacks
1.
2.
3.
4.
5.
Closure Trim
Internal
23
*Measure and cut the
closure trims to
fit the internal space.
23
23
Closure Trim
Internal
27
*Measure and cut the
closure trims to
fit the internal space.
27
27
Pre drill
hole
30mm
screw
*
trim to fit
Step 16
Parts needed - No. 27 QTY 4
Inside the building place the closure
trim (No. 27) against the boarding
and align with the roof as shown in
the illustration.
Once in position fix each trim
into place by pre drilling a pilot hole
and using 6x30mm screws per trim,
equally spacing them along the face
of the board.
24x30mm Screws
30mm
screw
Pre drill
hole
*
Cut to fit
Step 17
Parts needed - No. 27 QTY 4
Once the floor has been laid arrange the
closure trim (No. 27) around the outside
edge of floor (internally), measure and cut
down accordingly to best match the
internal space.
Secure each trim section into place using
6x30mm spaced equally along the board
as shown in the illustration.
*Do NOT fix the closure trim to the floor
boards.
24x30mm Screws
Roof
Roof