Mercia Garden Products 0619LOG001-V4 General Instructions Manual Download Page 8

P 8

Please retain product label and instructions for future reference

             

16

Step 13

Parts Needed - No. 14 QTY 2

Ensuring the roof boards are flush

at the overhanging side and meet

at the apex, fix the eaves frames 

(No. 14) to the underside of the roof

boards using 9x40mm screws as 

shown in the illustration

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in 

product. Nevertheless the process 

of fixing the eaves frames is the

same.

18x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 14

Parts Needed - No. 16 QTY 17

Place the first floor board (No. 16)

inside the building flush to the log

board on one side. Continue adding

the floor boards (

internally

) making

sure to interlock each individual

board.

*Do 

NOT

 secure the boards until

the last board has been measured

and cut.

Following the same method outlined

previously measure the gap between

the bottom of the tongue (on the last 

board placed) and the log board.

Using a straight edge mark out the 

measurement onto the last floor

board (No. 16) and cut along the 

length removing the excess.

**Please note:

 Mark the final board

2mm under the measurement; This

will allow the timber to expand and

contract correctly.

Once all the floor boards are in 

position secure each board into

position using 8x40mm screws.

***Please Note: 

Ensure to screw 

through each of the floor boards 

into the floor bearers.

136x40mm Screws 

40mm 

screw

Pre drill 

hole

*

Cut to fit

16

28

14

IMPORTANT: 

Pre-drill before fixing screws.

IMPORTANT: 

Pre-drill before fixing screws.

Summary of Contents for 0619LOG001-V4

Page 1: ...ine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides...

Page 2: ...mm QTY 6 LB19 B 1370 Log Board 19x120x310mm QTY 30 LB19 B 310 Log Board 19x120x310mm QTY 12 LB19 C 310 Log Board 19x120x2500mm QTY 19 LB19 A 2500 Log Board 19x120x2000mm QTY 38 LB19 A 2000 Log Board 1...

Page 3: ...60mm Bolt Set x16 P 3 Please retain product label and instructions for future reference Pre assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that...

Page 4: ...led base frame along the longest sides Ensure the notches at either end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the...

Page 5: ...the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame by 12 13 boards refer to door installation instructions if not you ca...

Page 6: ...er boards and rest on to the longer board Ensure the boards are level with each end Please note This image is for illustrative purposes and may differ from your choice in product regarding window posi...

Page 7: ...TY 38 Place the first two roof board s No 15 onto the assembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Ensur...

Page 8: ...oor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Following the same method outlined previously measure the g...

Page 9: ...crew trim to fit Step 15 Parts needed No 12 QTY 4 Inside the building place the closure trim No 12 against the boarding and align with the roof as shown in the illustration ensuring the angled face fo...

Page 10: ...40mm Screws Pre drill hole 40mm screw 14 14 14 14 IMPORTANT Pre drill before fixing screws 19 19 Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the bui...

Reviews: