Mercia Garden Products 05DTOVPN0365DD-V1 Instructions Manual Download Page 5

P 5

Please retain product label and instructions for future reference

             

Step 8

Parts Needed -

 

No. 12 QTY 2

 

 

 - No. 13 QTY 1

 

                                 

IMPORTANT: 

Pre-drill before fixing screws.

12

13

Pre drill 

hole

30mm 

screw

Fix the cover trims 

(No.12)

 to the 

gables sides, and the door side cover 

trim 

(No.13)

 to the inner door 

framing, securing into place using 

3x30mm screws per trim.

9x30mm Screws   

12

Attach two t-hinges 

(No.17)

 to each 

door 

(No.6)

, securing through to the 

door framing with 4x30mm screws 

per hinge.

16x30mm Screws  

Pre drill 

hole

30mm 

screw

Step 9

Parts Needed -

 

No. 6 QTY 2

 

 

 - No. 17 QTY 4

   

                                 

IMPORTANT: 

Pre-drill before fixing screws.

6

6

17

17

17

17

17

Step 10

                                 

IMPORTANT: 

Pre-drill before fixing screws.

Align each door 

(No.6) 

into the door 

gap and secure at either side using 

using 3x30mm screws per t-hinge 

(No.17)

.

12x30mm Screws  

6

6

Pre drill 

hole

30mm 

screw

17

7

11

a

b

b

b

Pre drill 

hole

30mm 

screw

Secure the eaves framing 

(No.11) 

to 

each roof sheet 

(No.7)

, flush to the edge, 

using 3x30mm screws.

Rest the assembled roof sections on top 

of the building and fix into place with 

8x30mm screws per roof.

22x30mm Screws    

a

Step 11

Parts Needed -

 

No. 7 QTY 2

 

 

 - No. 11 QTY 2

   

                                 

IMPORTANT: 

Pre-drill before fixing screws.

Summary of Contents for 05DTOVPN0365DD-V1

Page 1: ...ing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the...

Page 2: ...45 1178MM 13 Door Side Cover Trim 28x12x1178mm QTY 1 S1228 1178MM 14 15 Back Cover Trim 45x7x1094mm QTY 3 S745 1094MM Floor QTY 2 AI R11OSBF950X920 V1 5 Door QTY 2 AI R11FBOVFLD525X1110 V1 6 Roof QTY...

Page 3: ...from areas where standing water can collect 3x50mm Screws IMPORTANT Pre drill before fixing screws a Step 2 Parts Needed No 4 QTY 2 No 2 QTY 1 IMPORTANT Pre drill before fixing screws 2 4 4 a Pre dril...

Page 4: ...ned at either side of the build ing depending on your needs and preferences 3x50mm Screws Step 5 Parts Needed No 10 QTY 1 IMPORTANT Pre drill before fixing screws Step 6 Parts Needed No 9 QTY 1 No 18...

Page 5: ...Screws Pre drill hole 30mm screw Step 9 Parts Needed No 6 QTY 2 No 17 QTY 4 IMPORTANT Pre drill before fixing screws 6 6 17 17 17 17 17 Step 10 IMPORTANT Pre drill before fixing screws Align each door...

Page 6: ...19 Pre drill hole 30mm screw 16 Parts Needed No 16 QTY 2 No 19 QTY 2 Line up the door block No 16 at the top and bottom of the secondary door Fix with 2 x30mm screws through the outside of the door in...

Page 7: ...screw Fix the fascias No 15 around the top of the building make sure to trap the felt inbetween Secure each trim in place with 3x30mm screws 12x30mm Screws Step 16 Parts Needed No 15 QTY 4 IMPORTANT...

Page 8: ...P 8 2 1 3 4...

Page 9: ...P 9 1 2...

Reviews: