
P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
Step 1
Parts Needed -
No. 5 QTY 2
5
5
Pre drill
hole
50mm
screw
Place the two floors
(No.5)
onto a firm and
level base upside down.
Secure the floors
(No.5)
together using
3x50mm screws, fixing in an alternating
pattern as shown in the illustration.
Once fitted, turn the floor assembly the
right way up.
Ensure the base has suitable drainage & is
free from areas where standing water can
collect.
3x50mm Screws
IMPORTANT:
Pre-drill before fixing screws.
a
Step 2
Parts Needed -
No. 4 QTY 2
- No. 2 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
2
4
4
a
Pre drill
hole
50mm
screw
Place the back panels
(No.4)
and
the right gable
(No.2)
onto the
floor and secure in place using
6x50mm screws.
Do
not
secure to the floor until the
roof is fixed.
6x50mm Screws
Step 3
Parts Needed -
No. 1 QTY 1
- No. 3 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
a
a
Pre drill
hole
50mm
screw
a
a
a
a
a
3
1
Following the same method
outlined in step 2, place the front
panel
(No.1)
and the left gable
(No.3)
onto the floor and secure in
place using 6x50mm screws.
*The door opening can be posi-
tioned at either side of the build-
ing depending on your needs and
preferences.
Do
not
secure to the floor until the
roof is fixed.
6x50mm Screws
a
Summary of Contents for 05DTOVPN0365DD-V1
Page 8: ...P 8 2 1 3 4...
Page 9: ...P 9 1 2...