P 3
Please retain product label and instructions for future reference
Pre Assembly
Before assembling remove the transportation
blocks from the bottom of each panel.
Take care removing the blocks as to not damage
the panels. Tap with a flat headed screwdriver
and hammer.
Dispose of the blocks once removed.
Parts Needed - No. 1 Qty 1
No. 5 Qty 2
No. 13 Qty 4
Place the door gable
(No. 1)
on to a flat
surface and place both doors
(No. 5)
into the door apeture.
Locate the four t hinges
(No. 13)
onto
the doors and door gable ensuring they
sit over the door framing. Fix the hinges
to the door and door gable using
7x30mm screws per hinge.
28 x 30mm Screws
Step 1
1
5
13
30mm
screw
Pre drill
hole
IMPORTANT:
Pre-drill before fixing screws.
Parts Needed - No. 4 Qty 2
Place the floors
(No. 4)
on a firm and
level base, ensure the base has suitable
drainage, free from areas where water
can collect (see front page for base
requirements).
Position the floors side by side as
shown in the diagram. Fix together
using 4 x 50mm screws alternating the
fixing poisiton along the length of the
floor.
5 x 50mm Screws
Step 2
Pre drill
hole
50mm
screw
4
4
IMPORTANT:
Pre-drill before fixing screws.
Do not secure the building
to the floor until the roof is
fitted.
Fix the corner with 3x
50mm screw as shown in
diagram.
Step 3
Parts Needed - No. 2 Qty 1
No. 6 Qty 1
3 x 50mm Screws
Pre drill
hole
50mm
screw
IMPORTANT:
Pre-drill before fixing screws.
2
6
Summary of Contents for 05DTMBAX0307DD-V1
Page 8: ...P 8 2 1 3 4 ...