background image

P 3

Please retain product label and instructions for future reference

             

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

Take care removing the blocks as to not damage

the panels. Tap with a flat headed screwdriver 

and hammer.

Dispose of the blocks once removed.

Parts Needed - No. 1 Qty 1 

 

 

   No. 5 Qty 2

 

 

   No. 13 Qty 4

Place the door gable 

(No. 1)

 on to a flat 

surface and place both doors

 (No. 5) 

into the door apeture. 

Locate the four t hinges 

(No. 13) 

onto 

the doors and door gable ensuring they 

sit over the door framing. Fix the hinges 

to the door and door gable using 

7x30mm screws per hinge.

28 x 30mm Screws

Step 1

1

5

13

30mm 

screw

Pre drill 

hole

IMPORTANT: 

Pre-drill before fixing screws.

Parts Needed - No. 4 Qty 2

Place the floors 

(No. 4)

 on a firm and 

level base, ensure the base has suitable 

drainage, free from areas where water 

can collect (see front page for base 

requirements).

Position the floors side by side as 

shown in the diagram. Fix together 

using 4 x 50mm screws alternating the 

fixing poisiton along the length of the 

floor.

5 x 50mm Screws

Step 2

Pre drill 

hole

50mm 

screw

4

4

IMPORTANT: 

Pre-drill before fixing screws.

Do not secure the building 

to the floor until the roof is 

fitted.

Fix the corner with 3x 

50mm screw as shown in 

diagram.

Step 3

Parts Needed - No. 2 Qty 1

 

 

   No. 6 Qty 1

3 x 50mm Screws

Pre drill 

hole

50mm 

screw

IMPORTANT: 

Pre-drill before fixing screws.

2

6

Summary of Contents for 05DTMBAX0307DD-V1

Page 1: ...placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately t...

Page 2: ...X1327 V1 5 Door Qty 2 AI S11FBMBZBD781X1320 V1 4 Floor Qty 2 AI R11MBF795X988 V1 3 Roof Qty 2 AI S11MBOHAR1110X825 V1 7 Bolt Block 28x28x132mm Qty 4 FS2828 132mm 8 Fascia 12x56x1095mm Qty 4 s1256 1095mm 9 Ridge Bar 28x28x744mm Qty 1 FS2828 744mm 10 Cover Trim 12x45x1324mm Qty 4 S1245 1324mm 14 Felt PI 01 0025 15 Pad Bolt Qty 1 PI 07 0035 17 Turn Button Qty 2 PI 07 0034 12 Corner Brace Qty 2 PI 07 ...

Page 3: ...mm screws per hinge 28 x 30mm Screws Step 1 1 5 13 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws Parts Needed No 4 Qty 2 Place the floors No 4 on a firm and level base ensure the base has suitable drainage free from areas where water can collect see front page for base requirements Position the floors side by side as shown in the diagram Fix together using 4 x 50mm screws alte...

Page 4: ...n line with the central framing of the gable tops No 1 2 Fix in place with one Corner Brace No 12 at each end using 4x30mm screws per brace 8 x 30mm Screws Pre drill hole 50mm screw 9 12 A Step 6 IMPORTANT Pre drill before fixing screws Parts Needed No 3 Qty 2 Attach the roof No 3 using 7 x 30mm screws on each side Secure the roofs No 3 into place using 7 x 30mm screws ensure the roof sits square ...

Page 5: ...m screws as shown Pre drill to avoid splitting Attach the finial No 16 to the fascias at the front and the back of the building using 2 x 30mm screws per finial 16 x 30mm Screws IMPORTANT Pre drill before fixing screws 30mm screw Pre drill hole 16 16 8 8 8 8 10 10 10 Step 10 IMPORTANT Pre drill before fixing screws 30mm screw Pre drill hole Parts Needed No 10 Qty 1 Fit the Cover Trims No 10 to the...

Page 6: ...utton 2 x 30mm Screws 30mm screw Pre drill hole IMPORTANT Pre drill before fixing screws 17 17 17 Step 13 Parts Needed No 11 Qty 2 Locate the Door strips No 11 onto the door gable and fix into place using 3x30mm screws Ensure that the screw is parallel with the door frame when fixing as shown in the close up view 6 x 30mm Screws Pre drill hole IMPORTANT Pre drill before fixing screws 11 30mm screw...

Page 7: ...label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back ...

Page 8: ...P 8 2 1 3 4 ...

Page 9: ...P 9 1 2 ...

Reviews: