background image

P 8

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

Step 16

 

Fix the Casement stay 

(No. 18)

 to the 

opening window then align the fixings 

onto the window panel frame. Ensure the 

casement stay fits onto fixings when 

closed before screwing them down using 

6x20mm screws. 

 

6x20mm Screws.

Pre drill 

hole

20mm 

screw

6x20mm screws per casement stay

Step 17

 

Place the Roof panels 

(No. 5) 

&

 

(No. 6)

 on top of each gable, 

making sure they are flush to 

each gable and meet at the top 

of the apex.

Secure each roof panel to the 

building using 16x50mm screws.

 

16x50mm Screws.

*IMPORTANT:

 Ensure both roof 

sections meet at the top of the

apex as shown in the illustration.

Pre drill 

hole

50mm 

screw

*

Step 18

 

Attach the Roof Support bar 

(No. 12)

  

to the roof panels using 5x40mm 

screws. 

Screw diagonally through the 

support into the roof panel as shown 

in the diagram.

 

5x40mm Screws.

Pre drill 

hole

40mm 

screw

Step 19

 

Fix the door 

(No. 7)

 to the build-

ing using 16x30mm black screws 

per Butterfly Hinge 

(No. 17)

 as 

shown in the diagram.

 

 

16x30mm Black Screws.

Fit the turn buttons 

(No. 22)

 to 

the building using 2x30mm black 

screws.

2x30mm  Screws.

Pre drill 

hole

30mm 

screw

5

6

12

7

22

17

18

Summary of Contents for 04GREEN0606SDPB-V1

Page 1: ...of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is...

Page 2: ...26 V5 2 3 4 1 5 Roof AI 04GREENROOF1805X1037 V1 8 Door AI 04GREENDOOR550X1720 V2 9 Opening Window AI 04GREENOW560X460 V1 6 7 8 10 11 Fascia 12x56x1075mm x4 Base Frame 44x44x1864mm x2 Base Frame 44x44x...

Page 3: ...x21x560mm S1221 560mm 33 Strip 12x27x1776mm x3 S1227 1776mm 34 Strip 12x17x926mm x16 S1227 926mm 35 Strip 12x27x610mm x2 S1227 610mm Window Cill 610mm x2 Window Cill 1776mm x3 Styrene 942x570x2mm x11...

Page 4: ...ssemble the window panels on the floor Place the plastic window cill onto the external lip of the window panel 1b Lay the styrene on top of each open ing so that it overlaps the surronding framing equ...

Page 5: ...r using 3 x 50mm screws in the same way as the previous step 3x50mm screws Pre drill hole 50mm screw Step 6 Fix the Door Sides x2 No 1 between the window panels using 6x50mm screws in the same way as...

Page 6: ...ews The building can now be attached to the floor framing with 6x50mm screws per side 24x50mm Screws Pre drill hole 50mm screw Step 10 Fix the shorter Door strip No 16 to the top of the door opening w...

Page 7: ...panel using 4x16 black screws and 4x30mm screws per hinge No 17 4x30mm Screws 8x30mm Black Screws 8x16mm Black Screws 29 30 31 29 8 29 29 32 Step 14 Lay the roof panel down No 6 and place the styrene...

Page 8: ...each gable and meet at the top of the apex Secure each roof panel to the building using 16x50mm screws 16x50mm Screws IMPORTANT Ensure both roof sections meet at the top of the apex as shown in the i...

Page 9: ...ng 14x30mm screws as shown in the diagram 14x30mm Screws Pre drill hole 30mm screw Step 22 Fix the Roof trim No 15 to the top of the building and secure with 4x30mm screws as shown 4x30mm Screws Pre d...

Page 10: ...TREATMENT score around protective cover on glazing and carefully peel covering back SILICONE SEALANT Step 23 It is ESSENTIAL to seal around all window framing with silicone sealant not included to min...

Page 11: ...P 11 1 2...

Page 12: ...P 12...

Reviews: