background image

P 1

04GREEN0606SDPB-V1

6X6 GREENHOUSE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for your specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

Summary of Contents for 04GREEN0606SDPB-V1

Page 1: ...of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is...

Page 2: ...26 V5 2 3 4 1 5 Roof AI 04GREENROOF1805X1037 V1 8 Door AI 04GREENDOOR550X1720 V2 9 Opening Window AI 04GREENOW560X460 V1 6 7 8 10 11 Fascia 12x56x1075mm x4 Base Frame 44x44x1864mm x2 Base Frame 44x44x...

Page 3: ...x21x560mm S1221 560mm 33 Strip 12x27x1776mm x3 S1227 1776mm 34 Strip 12x17x926mm x16 S1227 926mm 35 Strip 12x27x610mm x2 S1227 610mm Window Cill 610mm x2 Window Cill 1776mm x3 Styrene 942x570x2mm x11...

Page 4: ...ssemble the window panels on the floor Place the plastic window cill onto the external lip of the window panel 1b Lay the styrene on top of each open ing so that it overlaps the surronding framing equ...

Page 5: ...r using 3 x 50mm screws in the same way as the previous step 3x50mm screws Pre drill hole 50mm screw Step 6 Fix the Door Sides x2 No 1 between the window panels using 6x50mm screws in the same way as...

Page 6: ...ews The building can now be attached to the floor framing with 6x50mm screws per side 24x50mm Screws Pre drill hole 50mm screw Step 10 Fix the shorter Door strip No 16 to the top of the door opening w...

Page 7: ...panel using 4x16 black screws and 4x30mm screws per hinge No 17 4x30mm Screws 8x30mm Black Screws 8x16mm Black Screws 29 30 31 29 8 29 29 32 Step 14 Lay the roof panel down No 6 and place the styrene...

Page 8: ...each gable and meet at the top of the apex Secure each roof panel to the building using 16x50mm screws 16x50mm Screws IMPORTANT Ensure both roof sections meet at the top of the apex as shown in the i...

Page 9: ...ng 14x30mm screws as shown in the diagram 14x30mm Screws Pre drill hole 30mm screw Step 22 Fix the Roof trim No 15 to the top of the building and secure with 4x30mm screws as shown 4x30mm Screws Pre d...

Page 10: ...TREATMENT score around protective cover on glazing and carefully peel covering back SILICONE SEALANT Step 23 It is ESSENTIAL to seal around all window framing with silicone sealant not included to min...

Page 11: ...P 11 1 2...

Page 12: ...P 12...

Reviews: