P 5
Please retain product label and instructions for future reference
Step 8
Fix the short Door strip
(No. 17)
to the
top of the door opening with 3x30mm
screws.
3x30mm Screws.
Pre drill
hole
30mm
screw
Step 9
Drop the Window
(No. 9)
into the
aperture and attach the window to the
Roof Panel
(No. 6)
using 3x16mm screws
and 3x30mm screws per butt hinge
(No. 16)
.
6x16mm Screws.
6x30mm Screws.
Pre drill
hole
16mm
screw
30mm
screw
30mm
16mm
16
9
6
Step 10
Fix the Casement stay
(No. 19)
to the
opening window then align the fixings
onto the window panel frame. Ensure the
casement stay fits into fixings when
closed before screwing them down using
6x20mm screws.
6x20mm Screws.
Pre drill
hole
20mm
screw
6x20mm screws per casement stay
19
Step 11
Place the Roof panels
(No. 6)
&
(No. 7)
on
top of each gable, making sure the roofs
are flush to each gable and meet at the
top of the apex.
Secure each roof panel to the building
using 16x50mm screws.
16x50mm Screws.
*IMPORTANT:
Ensure both roof
sections meet at the top of the
apex as shown in the illustration.
Pre drill
hole
50mm
screw
*
6
7